Lausanne tramway
| Lausanne tramway line T1 | |
|---|---|
Construction of the tram line in Renens | |
| Overview | |
| Locale | Vaud, Switzerland |
| Termini |
|
| Stations | 10 (phase 1) +6 (phase 2) |
| Website | https://tramway-lausannois.ch/ |
| Service | |
| Type | Tramway |
| Operator | Transports publics de la région lausannoise |
| History | |
| Planned opening | late 2026 (phase 1) 2027 (phase 2) |
| Technical | |
| Line length | 4.6 km (2.9 mi) (phase 1) 3.4 km (2.1 mi) (phase 2) |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
| Electrification | 750 V DC Overhead catenary |
The Lausanne tramway (French: tramway lausannois or French: tramway de Lausanne) is a second generation tramway. Line T1 of the Lausanne tramway will link Lausanne-Flon, in the centre of Lausanne, to Renens, to the west of the agglomeration. Its opening in late 2026 will mark the return of trams (streetcars as opposed to light rail) after the former tram system closed in 1964, over 60 years prior.
Line T1 is part of the Projet d’Agglomération Lausanne-Morges (PALM), a project that also includes a third metro line between Lausanne-Gare and Blécherette, three BRT lines, the development of RER Vaud and CFF lines, and the modernization of the Lausanne–Échallens–Bercher line.