Yarrawonga Weir
| Yarrawonga Weir | |
|---|---|
The weir in 2010 | |
Yarrawonga Weir | |
Interactive map of Yarrawonga Weir | |
| Country | Australia |
| Location |
|
| Coordinates | 36°00′S 146°05′E / 36.000°S 146.083°E |
| Purpose |
|
| Status | Operational |
| Construction began | 1935 |
| Opening date | 1939 |
| Owner | Murray–Darling Basin Authority |
| Operator | Goulburn–Murray Water |
| Dam and spillways | |
| Type of dam | Earth fill dam |
| Impounds | |
| Height (foundation) | 22 m (72 ft) |
| Length | 489 m (1,604 ft) |
| Dam volume | 126×103 m3 (4.4×106 cu ft) |
| Spillways | 10 |
| Spillway type | Controlled ogee crest |
| Spillway length |
|
| Spillway capacity | 3,540 m3/s (125,000 cu ft/s) |
| Reservoir | |
| Creates | Lake Mulwala |
| Total capacity | 117.5 GL (95,300 acre⋅ft) |
| Inactive capacity | 113 GL (92,000 acre⋅ft) |
| Catchment area | 26,100 km2 (10,100 sq mi) |
| Surface area | 4,390 ha (10,800 acres) |
| Normal elevation | 124.895 m (409.76 ft) AHD |
| Yarrawonga Weir Power Station | |
| Coordinates | 36°0′33.5″S 145°59′56.4″E / 36.009306°S 145.999000°E |
| Operator | AGL Energy |
| Commission date | June 1994 |
| Type | Run-of-the-river |
| Hydraulic head | 3 m (9.8 ft) |
| Turbines | 2 x 4.75 MW (6,370 hp) (Kaplan-type) |
| Installed capacity | 9.6 MW (12,900 hp) |
| Annual generation | 50 gigawatt-hours (180 TJ) |
| Website g-mwater.com.au | |
The Yarrawonga Weir is an earth-filled embankment dam across the Murray and Ovens rivers, located between Bundalong and Yarrawonga – in the Hume region of Victoria – and Mulwala – in the Riverina region of New South Wales – in eastern Australia. The weir, situated in Victoria, was completed in 1939 to form the reservoir, Lake Mulwala, for the purposes of water supply for irrigation in the surrounding district, regulate river flow, and serve as a crossing of the Murray between Victoria and New South Wales. A hydroelectric power station and a fish lift were added in 1994.
Owned by the Murray–Darling Basin Authority, the dam and reservoir are operated by Goulburn–Murray Water. Transport for New South Wales manages the waterway and the NSW Department of Primary Industries manages fishing on the reservoir.