Lærdal Tunnel
| Lærdal Tunnel | |
|---|---|
Interactive map of Lærdal Tunnel | |
| Overview | |
| Location | Vestland, Norway |
| Coordinates | 60°58′19″N 07°22′06″E / 60.97194°N 7.36833°E |
| Route | E16 |
| Operation | |
| Work began | 1995 |
| Opened | 27 November 2000 |
| Operator | Norwegian Public Roads Administration |
| Character | Road |
| Toll | None |
| Vehicles per day | 2,050 (2019) |
| Technical | |
| Length | 24.51 km (15.23 mi) |
Operating speed | 80 km/h (50 mph) |
| Max elevation | 265 m (869 ft) |
| Min elevation | 5 m (16 ft) |
| Width | 9 m (30 ft) |
| Grade | 2.5% |
The Lærdal Tunnel (Norwegian: Lærdalstunnelen) is a 24.51-kilometre-long (15.23 mi) road tunnel connecting Lærdal Municipality and Aurland Municipality in Vestland county, Norway; the southwest end of the tunnel is approximately 117 kilometres (73 mi) northeast of Bergen. It carries two lanes of the European Route E16 highway, and was the final link completing the main highway that now enables car travel between Oslo and Bergen with no ferry connections and no difficult mountain crossings during winter. It is the longest road tunnel in the world, followed by WestConnex in Sydney, Australia and Tianshan Shengli Tunnel in Xinjiang, China.