Kwu Tung station

Kwu Tung

古洞
MTR
The East Rail Line section of the Kwu Tung station, which has been capped (July 2026).
Chinese name
Chinese古洞
Literal meaningAncient Cave
Transcriptions
Standard Mandarin
Hanyu PinyinGǔdòng
Yue: Cantonese
Jyutpinggu2 dung6
General information
LocationHo Sheung Heung Road × Ma Tso Lung Road, Kwu Tung
North District, Hong Kong
Coordinates22°30′27″N 114°05′59″E / 22.50752°N 114.09962°E / 22.50752; 114.09962
ElevationUnderground
SystemFuture MTR rapid transit station
(Construction began in September 2023)
OwnerKCR Corporation
OperatorMTR Corporation
Lines
Platforms2 (1 island platform)
Tracks2
Connections
Construction
Structure type
Underground
Platform levels
1
Other information
Station codeKTU
WebsiteKwu Tung Station
History
OpeningExpected: 2027
Electrified25 kV 50 Hz AC (Overhead line)
Key dates
2021Planning and design commences
2022Project gazetted under the Railway Ordinance
2023Commencement of construction
2027Expected completion of construction
Services
Preceding station MTR MTR Following station
Sheung Shui
towards Admiralty
East Rail line
Opening 2027
Lok Ma Chau
Terminus
San Tin Northern Link
Opening 2034
Terminus
Northern Link
Proposed
Lo Wu South
towards Ping Che
Location
Kwu Tung is located in MTR
Kwu Tung
Kwu Tung
Location within MTR

Kwu Tung (Chinese: 古洞站; Jyutping: gu2 dung6) is an underground infill station currently under construction. It is situated on the Lok Ma Chau spur line of the East Rail line of the MTR rapid transit network in Hong Kong. The station will be situated near Kwu Tung in North District, New Territories.

It is part of the first phase of the Northern Link and act as its eastern terminus when phase 2 is completed, with an expected construction cost of HK$5.9 billion as of July 2023.