Kwasa Damansara MRT station
KG04 PY01 Kwasa Damansara | |||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Exterior view of the station seen from the Park N' Ride area in front of Pintu A | |||||||||||||||
| General information | |||||||||||||||
| Other names | |||||||||||||||
| Location | Kwasa Damansara, Seksyen U4, 40160 Shah Alam Selangor Malaysia | ||||||||||||||
| Coordinates | 3°10′35.3″N 101°34′21.2″E / 3.176472°N 101.572556°E | ||||||||||||||
| System | |||||||||||||||
| Owner | MRT Corp | ||||||||||||||
| Operator | Rapid Rail | ||||||||||||||
| Lines | |||||||||||||||
| Platforms | 2 stacked island platforms | ||||||||||||||
| Tracks | 4 | ||||||||||||||
| Construction | |||||||||||||||
Structure type | Elevated | ||||||||||||||
Platform levels | 2 | ||||||||||||||
| Parking | Available with payment. 550 parking bays; 100 motorcycle bays. | ||||||||||||||
Cycle facilities | Available. 46 bicycle bays, 2 disabled bicycle bays | ||||||||||||||
| Accessible | Yes | ||||||||||||||
| Other information | |||||||||||||||
| Station code | KG04 PY01 | ||||||||||||||
| History | |||||||||||||||
| Opened |
| ||||||||||||||
| Former names | Kota Damansara | ||||||||||||||
| Services | |||||||||||||||
| |||||||||||||||
| |||||||||||||||
The Kwasa Damansara MRT station is a mass rapid transit (MRT) station that serves the future township of Kwasa Damansara in Selangor, Malaysia, which is currently being developed. It is the first station and northern terminus of both the MRT Kajang Line and MRT Putrajaya Line.
The ceremony to launch Phase One of the Kajang Line by then Prime Minister of Malaysia Najib Razak was held at this station on 15 December 2016, and the station was officially opened on 16 December 2016. The station later became an interchange station between the MRT Kajang Line and the MRT Putrajaya Line which opened to the public on 16 June 2022. Both lines currently terminate at this station.