KhramGESStroy
трест «Храмгэсстрой» | |
| Successor | GruzGidroStroy |
|---|---|
| Formation | 1935 or 1936 (reported); active by 1938 |
| Defunct | 1951 |
| Type | Hydroelectric construction trust |
| Headquarters | Tbilisi, Georgian Soviet Socialist Republic, Soviet Union |
Region served | Georgian SSR |
| Fields | Hydroelectric, hydraulic-engineering and power-transmission construction |
Manager | Vakhtang Chankotadze |
Parent organization | Ministry of Power Stations (post-war period) |
| Award | Order of Lenin (1948) |
KhramGESStroy (Russian: трест «Храмгэсстрой»; Georgian: ხრამჰესმშენი), also rendered Khram GESStroy, was a Soviet hydroelectric construction trust headquartered in Tbilisi, in the Georgian SSR. A 1953 English-language intelligence report referred to it as the Khram Hydroelectric Power Station Construction Trust. It operated from the second half of the 1930s until 1951. Its initial purpose was to construct the Khrami I hydroelectric power station and the Tsalka Reservoir, and it later worked on other hydroelectric, irrigation and power-transmission projects. Its documented activities included the Sukhumi Hydroelectric Power Station, the Upper Samgori irrigation and energy system, the Sioni Reservoir, the Ortachala Hydroelectric Power Station, transmission lines and substations, as well as the wartime restoration of the Baksan Hydroelectric Power Station.
KhramGESStroy was awarded the Order of Lenin in 1948 for the construction and commissioning of the first stage of Khrami I. In 1951 it was succeeded by GruzGidroEnergoStroy, also known as GruzGidroStroy, which continued work on projects begun by KhramGESStroy.