John Day Dam

John Day Dam
The dam in 2013
John Day Dam is located in the United States
John Day Dam
John Day Dam
Location of the dam in the USA
Interactive map of John Day Dam
CountryUnited States
LocationSherman County, Oregon / Klickitat County, Washington
Coordinates45°42′59″N 120°41′40″W / 45.71639°N 120.69444°W / 45.71639; -120.69444
PurposePower
StatusOperational
Construction began1958 (1958)
Opening date1971 (1971)
Construction costUS$511 million
Built byU.S. Army Corps of Engineers
OperatorU.S. Army Corps of Engineers
Dam and spillways
Type of damGravity dam
ImpoundsColumbia River
Height183 ft (56 m)
Length7,365 ft (2,245 m)
Elevation at crest570 ft (170 m) AMSL
Spillways20
Spillway typeService, gate-controlled
Spillway length1,228 ft (374 m)
Reservoir
CreatesLake Umatilla
Total capacity2,530,000 acre⋅ft (3.12×10^6 ML)
Maximum length76 mi (122 km)
Maximum water depth268 ft (82 m)
Power Station
OperatorU.S. Army Corps of Engineers
TypeRun-of-the-river
Turbines16 × 140 MW (190,000 hp)
(20 maximum)
Installed capacity2,240 MW (3,000,000 hp)
(2,700 MW (3,600,000 hp) maximum)
2009 generation8,418 GWh (30,300 TJ)

The John Day Dam is a concrete gravity dam spanning the Columbia River in the northwestern United States. The dam features a navigation lock plus fish ladders on both sides. The John Day Lock has the highest lift (at 110 feet or 34 meters) of any U.S. lock. The reservoir impounded by the dam is Lake Umatilla, and it runs 76.4 miles (123.0 km) up the river channel to the foot of the McNary Dam. The John Day Dam is part of the Columbia River Basin system of dams and was established for the purpose of generating hydroelectricity via the run-of-the-river power station.