John Day Dam
| John Day Dam | |
|---|---|
The dam in 2013 | |
John Day Dam Location of the dam in the USA | |
Interactive map of John Day Dam | |
| Country | United States |
| Location | Sherman County, Oregon / Klickitat County, Washington |
| Coordinates | 45°42′59″N 120°41′40″W / 45.71639°N 120.69444°W |
| Purpose | Power |
| Status | Operational |
| Construction began | 1958 |
| Opening date | 1971 |
| Construction cost | US$511 million |
| Built by | U.S. Army Corps of Engineers |
| Operator | U.S. Army Corps of Engineers |
| Dam and spillways | |
| Type of dam | Gravity dam |
| Impounds | Columbia River |
| Height | 183 ft (56 m) |
| Length | 7,365 ft (2,245 m) |
| Elevation at crest | 570 ft (170 m) AMSL |
| Spillways | 20 |
| Spillway type | Service, gate-controlled |
| Spillway length | 1,228 ft (374 m) |
| Reservoir | |
| Creates | Lake Umatilla |
| Total capacity | 2,530,000 acre⋅ft (3.12×106 ML) |
| Maximum length | 76 mi (122 km) |
| Maximum water depth | 268 ft (82 m) |
| Power Station | |
| Operator | U.S. Army Corps of Engineers |
| Type | Run-of-the-river |
| Turbines | 16 × 140 MW (190,000 hp) (20 maximum) |
| Installed capacity | 2,240 MW (3,000,000 hp) (2,700 MW (3,600,000 hp) maximum) |
| 2009 generation | 8,418 GWh (30,300 TJ) |
The John Day Dam is a concrete gravity dam spanning the Columbia River in the northwestern United States. The dam features a navigation lock plus fish ladders on both sides. The John Day Lock has the highest lift (at 110 feet or 34 meters) of any U.S. lock. The reservoir impounded by the dam is Lake Umatilla, and it runs 76.4 miles (123.0 km) up the river channel to the foot of the McNary Dam. The John Day Dam is part of the Columbia River Basin system of dams and was established for the purpose of generating hydroelectricity via the run-of-the-river power station.