Jagorawi Toll Road
06°15′11″S 106°52′22″E / 6.25306°S 106.87278°E
| Jalan Tol Jakarta–Bogor–Ciawi | |
| Jagorawi Toll Road | |
![]() Southbound Jagorawi Toll Road heading to Citeureup, Bogor Regency in 2019 | |
| Route information | |
| Maintained by Jasa Marga | |
| Length | 59 km (37 mi) |
| Existed | 9 March 1978–present |
| History | Built in 1973-1978 |
| Major junctions | |
| North end | Cawang |
| |
| South end | Ciawi |
| Location | |
| Country | Indonesia |
| Provinces | |
| Major cities | |
| Highway system | |
The Jakarta–Bogor–Ciawi Toll Road (Indonesian: Jalan Tol Jakarta-Bogor-Ciawi) or shortened to Jagorawi Toll Road/Jalan Tol Jagorawi is the first controlled-access toll road in Indonesia. Construction of the highway began in 1973, and it was officially opened on 9 March 1978.
The Jagorawi Toll Road links the capital city of Jakarta to the West Javanese cities of Bogor and Ciawi. It has a length of around 59 kilometres (37 mi) going north and southbound and is operated by Jasa Marga, a state-owned enterprise.
The toll road has achieved break-even point, making it the cheapest toll road in Indonesia based on price per kilometer.
%20Toll%20Road%20(Jalan%20Tol%202)%2C%20August%202019%20(7).jpg%3C%2Ftitle%3E%3Cdefs%3E%3CclipPath%20id%3D%22alt-text-clip%22%3E%3Crect%20x%3D%220%22%20y%3D%220%22%20width%3D%22100%25%22%20height%3D%22100%25%22%20%2F%3E%3C%2FclipPath%3E%3C%2Fdefs%3E%3Crect%20width%3D%22100%25%22%20height%3D%22100%25%22%20fill%3D%22transparent%22%2F%3E%3Cg%20clip-path%3D%22url(%23alt-text-clip)%22%3E%3Ctext%20x%3D%2250%25%22%20y%3D%2250%25%22%20text-anchor%3D%22middle%22%20dominant-baseline%3D%22middle%22%20fill%3D%22%2354595d%22%20font-size%3D%2216%22%20font-family%3D%22sans-serif%22%3EJakarta-Bogor-Ciawi%20(JBC)%20Toll%20Road%20(Jalan%20Tol%202)%2C%20August%202019%20(7).jpg%3C%2Ftext%3E%3C%2Fg%3E%3C%2Fsvg%3E)