Indore–Budhni line

Indore–Budhni line
Overview
StatusUnder construction
OwnerIndian Railways
LocaleMadhya Pradesh, India
Termini
Stations18
Service
TypeBroad gauge
SystemIndian Railways
Operator(s)Western Railway
West Central Railway
Technical
Line length198 km (123 mi)
Number of tracks1
CharacterAt grade, with tunnels and viaducts
Track gauge5 ft 6 in (1,676 mm) broad gauge
ElectrificationElectrified
Operating speed160 km/h (99 mph) (design speed)

The Indore–Budhni railway line is an under-construction broad gauge railway line in the Indian state of Madhya Pradesh. It connects Manglaya Sadak near Indore with Budhni, providing a direct rail link between the Indore region and the existing national railway network at Budhni.

The project is being implemented by Rail Vikas Nigam Limited (RVNL). Current Government of India project-monitoring records identify it as the Indore–Budni New Railway Line [198 kms], with an updated project cost of ₹7,474 crore and a target completion date of 30 September 2030.