Line 2 (Guangzhou Huangpu Tram)
| Guangzhou Huangpu Tram Line 2 | |
|---|---|
| THP2 | |
A tram in Kaiyuan Road East station | |
| Overview | |
| Native name | 广州黄埔有轨电车2号线 |
| Owner | Guangzhou Huangpu Light Rail Line 2 Construction & Investment Co., Ltd. |
| Locale | Huangpu District, Guangzhou, Guangdong |
| Termini |
|
| Stations | 8 (in operation) 20 (future) |
| Service | |
| Type | Tram |
| System | Guangzhou Trams |
| Services | 1 |
| Operator(s) | Guangzhou Metro Transit Development Co., Ltd. |
| Depot(s) | Yuangang Depot Liucun Depot |
| History | |
| Opened | 20 June 2025 |
| Technical | |
| Line length | 4.9 km (3.0 mi) |
| Number of tracks | 2 |
| Character | At-grade |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Guangzhou Huangpu Tram Line 2 (Chinese: 广州黄埔有轨电车2号线) is a tram line serving the Huangpu District of Guangzhou, operated by Guangzhou Trams. On 20 March 2023, the northern section of the Guangzhou Huangpu Tram Line 2 project (Xiangxue Subway Station - Kaiyuan Road East Station) was put into trial operation. On 20 June 2025, the northern section officially opened for passenger service. It is 14.38 km (8.9 mi) in length with 20 stations, of which currently 8 stations spanning 4.9 km (3.0 mi) are operational.
The northern section of this line (Xiangxue Subway Station – Kaiyuan Road East) completed its pre-operation safety assessment as early as April 2023. However, due to disagreements between the owner and the operator regarding the entrusted operation contract, and the failure to rectify some issues identified in the safety assessment, its opening was delayed until 20 June 2025. The remaining southern section is still under construction and will be developed in conjunction with related municipal facilities.