Skyline (Honolulu)

Skyline
A Skyline train arriving at Āhua (Lagoon Drive) station
Overview
OwnerHonolulu Department of Transportation Services
LocaleCity and County of Honolulu
Termini
Stations13 in service (6 under construction, 2 planned)
Websitewww.honolulu.gov/dts/skyline/
honolulutransit.org
Service
TypeLight metro
OperatorHitachi Rail
Rolling stockHitachi Rail Italy Driverless Metro
Daily ridership11,600 (weekdays, Q2 2026)
Ridership1,696,800 (2025)
History
OpenedJune 30, 2023 (2023-06-30)
Technical
Line length16.1 mi (25.9 km)
Number of tracks2
CharacterMostly elevated (except Hālaulani, which is at-grade)
Track gauge4 ft 8+1⁄2 in (1,435 mm) standard gauge
ElectrificationThird rail, 750 V DC
Operating speed55 mph (89 km/h)
Route map
Skyline highlighted in blue
Kualakaʻi (East Kapolei)
Keoneʻae (UH–West)
Parking
Honouliuli (Hoʻopili)
Parking
Down arrow above HI-93.svg
Route 93
Farrington Hwy
Down arrow above HI-76.svg
Route 76
Fort Weaver Rd
Hōʻaeʻae (West Loch)
Parking
Pouhala (Waipahu TC)
Maintenance facility
Hālaulani (Leeward CC)
I-H1.svg H-1 / I-H2.svg H-2
Down arrow above HI-99.svg
Route 99
Kamehameha Hwy
Waiawa (Pearl Highlands)
Down arrow above I-H1.svg H-1
Kalauao (Pearlridge)
Pearlridge Center#Skycab Parking
Hālawa (Aloha Stadium)
Parking
Makalapa (JB Pearl Harbor–Hickam)
I-H1.svg H-1 / HI-92.svg
Route 92
Nimitz Hwy
Lelepaua (Honolulu Airport)
Daniel K. Inouye International Airport
Āhua (Lagoon Drive)
Down arrow above Dillingham Blvd
Kahauiki (Middle Street–Kalihi TC)
Down arrow opening 2031
Mokauea (Kalihi)
Down arrow Mauka shift
Niuhelewai (Honolulu CC–Kapalama)
Down arrow above Dilingham Blvd
Kūwili (Iwilei)
Down arrow above HI-92.svg
Route 92
Nimitz Hwy
Hōlau (Chinatown)
Kuloloia (Downtown)
Down arrow above Halekauwila Street
Kaʻākaukukui (Civic Center)
planned extension
Down arrow planned extension
Kūkuluaeʻo (Kākāʻako)
Kālia (Ala Moana Center)

Handicapped/disabled access All stations are accessible

Skyline is a light metro rapid transit system in the City and County of Honolulu on the island of Oʻahu, in the state of Hawaiʻi. Segment 1 of the project, which lies entirely outside of the Urban Honolulu census-designated place, opened on June 30, 2023 linking East Kapolei (on the ʻEwa Plain) and Aloha Stadium in Hālawa. Segment 2, connecting to Pearl Harbor, Daniel K. Inouye International Airport and Middle Street, opened on October 16, 2025. Segment 3, continuing the line across Urban Honolulu to Downtown, is due to open in 2031. The construction of Skyline constitutes the largest public works project in Hawaiʻi's history.

The 18.9-mile (30.4 km), automated fixed-guideway line was planned, designed, and constructed by the Honolulu Authority for Rapid Transportation (HART), a semi-autonomous government agency. Hitachi Rail, who also built the railcars used on the line, operates Skyline for the Honolulu Department of Transportation Services (which also manages the island's TheBus service). The almost entirely elevated line is the first large-scale, publicly run metro in the United States to feature platform screen doors and driverless trains. In 2025, the line had an annual ridership of 1,696,800, or about 11,600 per day as of the second quarter of 2026, compared to the 25,000 per day that was predicted in 2023.