Hillingdon Sports and Leisure Complex

Hillingdon Sports and Leisure Complex
The refurbished outdoor pool in May 2010
Interactive map of Hillingdon Sports and Leisure Complex
LocationGatting Way,
Park Road,
Uxbridge, UB8 1NR
OwnerLondon Borough of Hillingdon
OperatorFusion Lifestyle
Dimensions
  • Length: 220 feet (67 m)
  • Width: 72.5 feet (22.1 m)
Construction
Opened1935
Closed1998*
Reopened 2010
ArchitectG.P. Trentham
Website
fusion-lifestyle.com/centres/Hillingdon_Sport_and_Leisure_Complex
Listed Building – Grade II
Official name
Uxbridge Lido
Designated24 April 1998
Reference no.1323711
Listed Building – Grade II
Official name
Entrance Building, Uxbridge Lido
Designated24 April 1998
Reference no.1323712
Listed Building – Grade II
Official name
North Fountain, Uxbridge Lido
Designated24 April 1998
Reference no.1323713
Listed Building – Grade II
Official name
South Fountain, Uxbridge Lido
Designated24 April 1998
Reference no.1323714
Listed Building – Grade II
Official name
Grandstand, Uxbridge Lido
Designated24 April 1998
Reference no.1323715

The Hillingdon Sports and Leisure Complex is a leisure centre in Uxbridge, operated by Better (GLL) on behalf of the London Borough of Hillingdon. The complex is centred on the Grade II listed outdoor swimming pool, known as Uxbridge Lido until 2010, when the newly built centre and refurbished pool were opened. A new indoor pool was built beside the lido as part of the redevelopment works, opening in February 2010, followed a day later by the outdoor pool.

The outdoor pool was built in 1935 in the "Moderne" or Art Deco style, at a cost of £24,500. It was closed in 1998 and became subject to heavy vandalism. In 2007 it was announced that the pool would be restored in time to be used as a training pool for the 2012 Summer Olympics.