Haznedar station
Platform | |||||||||||
| General information | |||||||||||
| Location | Bahçelievler Neighborhood, İzzettin Çalışlar Street, 34180 Bahçelievler, Istanbul Turkey | ||||||||||
| Coordinates | 41°0′17″N 28°52′18″E / 41.00472°N 28.87167°E | ||||||||||
| System | Istanbul Metro rapid transit station | ||||||||||
| Owner | Istanbul Metropolitan Municipality | ||||||||||
| Line | |||||||||||
| Platforms | 1 Island platform | ||||||||||
| Tracks | 2 | ||||||||||
| Connections | |||||||||||
| Construction | |||||||||||
Structure type | Underground | ||||||||||
| Parking | No | ||||||||||
Cycle facilities | Yes | ||||||||||
| Accessible | Yes | ||||||||||
| History | |||||||||||
| Opened | 10 March 2024 | ||||||||||
| Electrified | 1,500 V DC Overhead line | ||||||||||
| Services | |||||||||||
| |||||||||||
| |||||||||||
Haznedar is an underground station on the M3 line of the Istanbul Metro. It is located under İzzettin Çalışlar Street in the Bahçelievler neighborhood of Bahçelievler. It was opened on 10 March 2024, with the opening of the M3 extension from Kirazlı to Bakırköy Sahil.