Harbin–Dalian high-speed railway

Beijing–Harbin high-speed railway
Harbin–Dalian Section
Overview
Native name京哈高速铁路哈大段
StatusOperational
OwnerChina Railway China Railway
Locale
Termini
Stations23
Service
TypeHigh-speed rail
SystemChina Railway High-speed China Railway High-speed
Operators
Rolling stockCRH380BG
History
OpenedDecember 1, 2012 (2012-12-01)
Technical
Line length904 km (562 mi)
Number of tracks2 (Double-track)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Minimum radius7,000 m (23,000 ft)
Electrification25 kV 50 Hz AC (Overhead line)
Operating speed
  • 350 km/h (217 mph) (design)
  • 300 km/h (186 mph) (operational)
  • 310 km/h (193 mph) (ATP)
Route map


km
Dalian
0
Dalian North
Left arrowShenyang–Dalian railway to Shenyang North
41
Jinpu
78
Wafangdian West
149
Bayuquan
178
Gaizhou West
206
Yingkou East
244
Haicheng West
283
Anshan West
Right arrowShenyang–Dalian railway to Dalian
313
Liaoyang
364
Shenyang South
378
Shenyang
(high-speed field)
383
Shenyang North
(high-speed field)
Left arrowShenyang–Jilin railway to Jilin
437
Tieling West
484
Kaiyuan West
512
Changtu West
563
Siping East
618
Gongzhuling East
681
Changchun West
Left arrowChangchun West link line to Changchun
765
Dehui West
823
Fuyu North
881
Shuangcheng North
921
Harbin West
Harbin
km

The Harbin–Dalian high-speed railway or Hada High-Speed Railway (Chinese: 哈大高速铁路; pinyin: Hādà Gāosù Tiělù) is a high-speed rail line connecting Harbin, Heilongjiang and Dalian, Liaoning. The line is the world's first alpine high-speed railway operating at high latitudes and low temperatures in winter. The trains can continue operating even with snow on the line and the tracks are fitted with de-icing technology. The project cost CN¥95 billion, which was 25% more than the original budget. The first commercial services began operating in December 1, 2012. At the time of completion, the railway was the northernmost high-speed line in China.

Construction work began on August 23, 2007. The climate of Northeast China poses a challenge to the design; parts of the line had to be rebuilt before the opening due to deformation caused by frost heaving. Test runs along the entire railway started on October 8, 2012. Eventually, it was decided that the route could be opened for commercial services on December 1, 2012, nearly one year behind schedule. On opening day the first commercial passenger services started with two trains leaving simultaneously, one from Dalian and the other from the new Harbin West station. During the first 52 days of operation, the line transported 2.856 million passengers.