Haltenpipe

Haltenpipe
Location
CountryNorway
StartHeidrun field
Passes throughNorth Sea
ToTjeldbergodden
General information
Typenatural gas
OwnerGassled
OperatorGassco
Technical service provider
Statoil
Construction started
1994
Commissioned1996
Technical information
Maximum discharge
2.2. billion cubic metres per year
Diameter16 in (406 mm)

Haltenpipe is a gas transport system which consists of a 250 kilometres (160 mi) long pipeline from the Heidrun field to Tjeldbergodden. It started operation in December 1996, and is operated by Gassco. Transport capacity is 2.2. billion cubic metres per year.