Hakodate Main Line

Hakodate Main Line
A Rapid Airport 733 series train running along the coast of the Sea of Japan, near Asari Station in Otaru
Overview
Owner JR Hokkaido
LocaleHokkaido
Termini
Stations76 (main line)
6 (branch line)
Service
TypeRegional rail
Operator(s)JR Hokkaido and JR Freight
Depot(s)Sapporo depot (near Inaho), Naebo Workshop & depot
History
OpenedNovember 28, 1880 (November 28, 1880)
Technical
Line length423.1 km (262.9 mi)
Number of tracksSingle (Nanae-Mori (include branch), Washinosu signal base-Yamasaki, Kuroiwa-Kita‐Toyotsu signal base and Oshamambe-Otaru)
Double (elsewhere)
Track gauge1,067 mm (3 ft 6 in)
Electrification20 kV 50 Hz AC overhead catenary (Hakodate to Shin-Hakodate-Hokuto, Otaru to Asahikawa)
Operating speed130 km/h (81 mph)
Route map

The Hakodate Main Line (函館本線, Hakodate-honsen) is a railway line connecting the cities of Hakodate and Asahikawa via Sapporo in Hokkaido, Japan. It is one of the trunk lines that is operated by the Hokkaido Railway Company (JR Hokkaido). The Sawara Line, a 35 km (22 mi) loop line from Ōnuma to Mori opened in 1945, is included as part of the Hakodate Main Line.

The Sapporo—Minami-Otaru section was the first railway line that opened in Hokkaido (including the Minami-Otaru - Temiya Line to the Otaru Port). The line was extended as the first to connect to Hakodate, though today all Sapporo—Hakodate direct passenger and freight services travel via the Chitose and Muroran lines until rejoining the Hakodate line at Oshamambe Station.

The Hokkaido Shinkansen route north of Shin-Hakodate-Hokuto approximately parallels the route of the Hakodate Main Line, with stations proposed to be built at Shin-Yakumo, Oshamambe, Kutchan, Shin-Otaru and Sapporo.

On March 27, 2022, municipalities along the line agreed to close the Oshamanbe—Otaru section after the opening of the Hokkaido Shinkansen extension to Sapporo in 2030. The entire section will be converted into multiple bus routes. However, the bus companies along the line have stated that they do not currently have the capacity to provide the replacement routes, and municipalities have threatened to withdraw support for the line's closure.