Guicam Bridge
Olutanga Bridge Tulay ng Olutanga | |
|---|---|
| Coordinates | 7°26′10″N 122°50′16″E / 7.4359778°N 122.837814°E |
| Carries | 2 lanes of Lutiman-Guicam-Olutanga Road; Pedestrians and vehicles |
| Crosses | Canalizo Strait |
| Locale | Alicia and Mabuhay, Zamboanga Sibugay |
| Named for | Barangay Guicam in Alicia, Zamboanga Sibugay |
| Maintained by | Department of Public Works and Highways |
| Characteristics | |
| Design | Girder bridge |
| Total length | 1.2 km (0.75 mi) |
| Longest span | 540.80 m (1,774.3 ft) |
| 14.8 km (9.2 mi) | |
| No. of lanes | Two-lane single carriageway |
| History | |
| Construction start | 29 January 2021 |
| Construction cost | PH₱ 1.06 billion |
| Location | |
Interactive map of Olutanga Bridge | |
The Olutanga Bridge is a under construction 1.2 km (0.75 mi) concrete girder bridge between the towns of Alicia and Mabuhay in Zamboanga Sibugay, Philippines. The bridge will connect Olutanga Island and its three municipalities of Mabuhay, Talusan, and Olutanga with the rest of Mindanao Island, which are separated by the Canalizo Strait.