Gordon Dam
| Gordon Dam | |
|---|---|
The double-arch dam wall, holding back Lake Gordon | |
Gordon Dam Location of the dam in Tasmania | |
Interactive map of Gordon Dam | |
| Country | Australia |
| Location | South West Tasmania |
| Coordinates | 42°43′50″S 145°58′35″E / 42.73056°S 145.97639°E |
| Purpose | Power |
| Status | Operational |
| Construction began | 1964 |
| Opening date | 25 November 1974 |
| Owner | Hydro Tasmania |
| Dam and spillways | |
| Type of dam | Arch dam |
| Impounds | Gordon River |
| Height | 140 m (460 ft) |
| Length | 198 m (650 ft) |
| Elevation at crest | 310 m (1,020 ft) AHD |
| Width (crest) | 2.75 m (9 ft 0 in) |
| Width (base) | 17.7 m (58 ft) |
| Dam volume | 154×103 m3 (5.4×106 cu ft) |
| Spillways | none |
| Reservoir | |
| Creates | Lake Gordon |
| Total capacity | 12,400 GL (10.1×106 acre⋅ft) |
| Catchment area | 1,280 km2 (490 sq mi) |
| Surface area | 278 km2 (69,000 acres) |
| Gordon Power Station | |
| Coordinates | 42°43′48″S 145°58′12″E / 42.73000°S 145.97000°E |
| Operator | Hydro Tasmania |
| Commission date | 1978; 1988 |
| Type | Conventional |
| Turbines | 3 x Fuji 144 MW (193,000 hp) |
| Installed capacity | 432 to 450 MW (579,000 to 603,000 hp) |
| Capacity factor | 0.9 |
| Annual generation | 1,388 GWh (5,000 TJ) |
| Website hydro.com.au/ | |
The Gordon Dam, also known as the Gordon River Dam, is a major gated double-curvature concrete arch dam across the Gordon River, in the South West region of Tasmania, Australia. Construction of the dam commenced in 1964 and was completed in 1974. The resultant reservoir, Lake Gordon, was established for the purpose of generating hydroelectricity via the Gordon Power Station. The power station also receives inflows from Lake Pedder.
The dam, its reservoir, and the power station are owned and operated by Hydro Tasmania.
The dam and the associated Gordon Power Development Scheme is significant in terms of its size and complexity of the project's construction. At the time of its construction, the dam added substantially to the capacity of Tasmania's electricity generating system by delivering clean, renewable energy, catering for growing demand, and assisting the state to attract new industries. The project was also politically controversial in terms of the environmental impact of both the completed and proposed, subsequently cancelled, works.