Gold Line (Dubai Metro)
| Gold Line | |
|---|---|
| Overview | |
| Status | Planned |
| Owner | Roads and Transport Authority |
| Locale | Dubai, United Arab Emirates |
| Stations | 18 (planned) |
| Service | |
| Type | Rapid transit |
| System | Dubai Metro |
| Services | 1 |
| History | |
| Planned opening | 9 September 2032 |
| Technical | |
| Track length | 42 km (26 mi) |
The Gold Line is a planned rapid transit line of the Dubai Metro in Dubai, United Arab Emirates. Announced on 22 April 2026, the line is planned to be 42 kilometres (26 mi) long, serve 15 strategic areas in Dubai, and connect with 55 major real-estate developments under construction.
The project is valued at AED 34 billion and is scheduled to open on 9 September 2032. According to contemporary reporting based on project materials and the Dubai government's released rail plan map, the Gold Line will run from Al Ghubaiba to Jumeirah Golf Estates, with interchange connections to the existing Red Line and Green Line, and a future interchange with Etihad Rail.