Garcon Point Bridge
Garcon Point Bridge | |
|---|---|
| Coordinates | 30°25′17″N 87°5′27″W / 30.42139°N 87.09083°W |
| Carries | 2 lanes of |
| Crosses | East Bay |
| Locale | Santa Rosa County, Florida |
| Maintained by | Florida's Turnpike Enterprise |
| ID number | 580174 |
| Characteristics | |
| Design | Segmental box girder |
| Material | Prestressed concrete |
| Total length | 18,425 feet (5,616 meters) |
| Width | 40 feet (12 meters) |
| No. of spans | 127 |
| 65.6 feet (20.0 meters) | |
| History | |
| Designer | Figg Bridge Engineers |
| Opened | May 14, 1999 |
| Statistics | |
| Daily traffic | over 6,000 (2022) |
| Toll | $2.30 (base) |
| Location | |
Interactive map of Garcon Point Bridge | |
The Garcon Point Bridge is a two-lane toll bridge in Santa Rosa County, Florida. The bridge runs north-south across East Bay between Garcon Point and the Fairpoint Peninsula. The bridge carries Avalon Boulevard (SR 281), which connects Gulf Breeze Parkway (US 98) on the peninsula to I-10 and US 90 on the mainland near Milton.
The bridge was originally constructed by the Santa Rosa Bay Bridge Authority, a state-level special-purpose district. Due to traffic on the bridge never meeting initial projections, the authority was disbanded and the bridge was taken over by bondholders. In 2022, the bridge was acquired by the state government; it is currently managed as part of Florida's Turnpike System.
Tolls are collected via electronic toll collection at the north end of the bridge. As of September 2025, base tolls on the bridge are $2.30 for payments made by a SunPass-compatible transponder and $2.75 for toll-by-plate.