Folkston Cutoff

Folkston Cutoff
Overview
StatusStill operating
OwnerPlant System (1901-1902)
Atlantic Coast Line Railroad (1902-1967)
Seaboard Coast Line Railroad (1967-1986)
CSX Transportation (1986-present)
Termini
Technical
Line length54.3 mi (87.4 km)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
ElectrificationNo
SignallingCentralized traffic control
Route map

The Folkston Cutoff is a railroad line in southern Georgia. It runs from Jesup southwest to Folkston, a distance of 54 miles. It was built in 1901 by the Plant System to allow trains from the northeast to Florida to bypass their busy terminal in Waycross.