Flushing Meadows Corona Park Aquatics Center

Flushing Meadows Corona Park Aquatics Center and Ice Rink
Main entrance
Interactive map of the Flushing Meadows Corona Park Aquatics Center and Ice Rink area
Alternative names
Flushing Meadows Natatorium
General information
Location125–40 Roosevelt Avenue, Flushing, New York 11355, United States
Coordinates40°45′06″N 73°50′15″W / 40.75167°N 73.83750°W / 40.75167; -73.83750
Construction started
2001
Completed
February 2008
Cost$66.3 million
OwnerCity of New York
Technical details
Floor area110,000 square feet (10,000 m2)
Design and construction
Architecture firm
Handel Architects; Kevin Hom Architects
Structural engineer
Geiger Engineers
Awards2009 AISC Ideas2 Award for Innovative Design in Engineering and Architecture with Structural Steel

The Flushing Meadows Corona Park Aquatics Center and Ice Rink, also known as the Flushing Meadows Corona Park Aquatics Center or Flushing Meadows Natatorium, is a 110,000-square-foot (10,000 m2) facility in Flushing Meadows-Corona Park, Queens, New York City, with an Olympic-sized pool and an NHL-standard rink. Built in 2008, the $66.3 million project is the first indoor public pool to open in New York City in four decades. Initially, the building was intended to serve as the venue for water polo events during the 2012 Summer Olympics, but when the city's bid was lost to London, the New York City Department of Parks and Recreation proceeded to build the pool anyway. The result is an innovative building with 130-foot-high twin masts and a swooping roof form. The masts are an architectural feature extending up into the Queens skyline as well as the structural supports for the cable-stayed roof. This design provides the clear spans necessary to house an Olympic swimming pool along with an ice skating rink.

The Flushing Meadows Natatorium was designed by Handel Architects in association with Kevin Hom Architects (formerly Kevin Hom +Andrew Goldman Architects).