Gateway Expressway
Gateway Expressway | |||||||
|---|---|---|---|---|---|---|---|
| State Road 690, State Road 686A | |||||||
SR 690 in red, SR 686A in blue | |||||||
| Route information | |||||||
| Existed | 2024–present | ||||||
| History |
| ||||||
| State Road 690 | |||||||
| West end | |||||||
| Major intersections | |||||||
| East end | |||||||
| State Road 686A | |||||||
| South end | |||||||
| North end | |||||||
| Location | |||||||
| Country | United States | ||||||
| State | Florida | ||||||
| Counties | Pinellas | ||||||
| Highway system | |||||||
| |||||||
The Gateway Expressway is a controlled-access toll road in Pinellas County, Florida completed in April 2024 at a cost of $598 million. The project consists of two branches: an elevated highway designated State Road 690 (SR 690) above 118th Avenue North between Interstate 275 (I-275) and U.S. Highway 19 (US 19) and a raised highway designated State Road 686A (SR 686A) in the median of SR 686 from 118th Avenue North to the Bayside Bridge. Construction was approved in February 2014, began in November 2017, and completed on April 26, 2024.