Fastrack (bus rapid transit)

Fastrack
Irizar ie tram buses of Fastrack using pantograph charging at Gravesend railway station in March 2026
Irizar ie tram buses of Fastrack using pantograph charging at Gravesend railway station in March 2026
Overview
LocaleKent Thameside
Dover
Transit typeBus rapid transit
Number of lines
7
Websitewww.kent-fastrack.co.uk
Operation
Began operation
26 March 2006 (2006-03-26) (Kent Thameside)
17 November 2024 (2024-11-17) (Dover)
OperatorsGo-Ahead London
Stagecoach South East

Fastrack is the name given to two bus rapid transit schemes in Kent. The original network began on 26 March 2006 in Dartford and Gravesend, part of the Thames Gateway regeneration area, and on 17 November 2024 a separate network was launched in Dover.