Fargo–Moorhead Area Diversion Project
The Fargo–Moorhead (FM) Area Diversion project, officially known as the Fargo–Moorhead Metropolitan Area Diversion Flood Risk Management Project, is a large, regional flood control infrastructure project on the Red River of the North, which forms the border between North Dakota and Minnesota and flows north to Lake Winnipeg in Manitoba, Canada.
The Red River has flooded the Red River Valley numerous times since the late 1800s, and eight of the top ten floods have occurred since 1989. When it is ready to operate in 2027, the roughly $3.2-billion project will protect more than 273,000 people in the Fargo–Moorhead metropolitan area from catastrophic flooding. Ultimately, it also will free residents and businesses from the need for flood insurance once the project is certified by the Federal Emergency Management Agency (FEMA).
The project includes a 30-mile (48-kilometer) stormwater diversion channel that extends from just south of Horace, ND, to north of Argusville, ND (across from Georgetown, MN). It also incorporates a 22-mile (35-kilometer) earthen embankment south of the city of Fargo, two first-of-their-kind aqueducts to enable fish passage across the channel, three gated structures to control water flows, and a variety of road and railroad crossings, road-grade raises, floodwalls, levees, stormwater lift stations, channel inlets, wetland restoration acreage, and mitigation projects.
The project was authorized for construction by the Water Resources Reform and Development Act of 2014. The design and construction are being done using a split-delivery model, with the US Army Corps of Engineers and its non-federal sponsors completing different parts of the project simultaneously. A Project Partnership Agreement pairs the Corps of Engineers with the project's non-federal sponsors—the Metro Flood Diversion Authority, City of Fargo, ND, and City of Moorhead, MN. The Metro Flood Diversion Authority, a permanent North Dakota political subdivision, oversees the non-federal work, which includes a public-private partnership (P3) for the stormwater diversion channel and its associated infrastructure. The project is the first P3 ever done in conjunction with the US Army Corps of Engineers and is a pilot project for the split-delivery model nationwide. It is also the first P3 water management project in North America, and the first green finance initiative in the United States specifically designed for climate change adaptation.
Under the project agreements, the US Army Corps of Engineers is designing and constructing the southern embankment, water-control structures, and associated infrastructure. The non-federal sponsors, in turn, will design, finance, construct, operate, and maintain the stormwater diversion channel, aqueducts, numerous road and railroad crossings, and in-town work, including levees, floodwalls, and stormwater lift stations. Numerous mitigation projects involving wetlands, native plantings, and fish passage have been incorporated in the project.