|
 F110 class |
|
|
|
|
| Name | Bonifaz class (F110) |
|---|
| Builders | Navantia |
|---|
| Operators | Spanish Navy |
|---|
| Preceded by | Álvaro de Bazán class |
|---|
| Cost |
- € 4.3 billion (US$5.09 billion) for five units
- € 860 million (US$1.02 billion) per unit
|
|---|
| Planned | 5 ordered (+ 2 potentially) |
|---|
| Building | 4 |
|---|
|
|
|
|
| Type | |
|---|
| Displacement | |
|---|
| Length |
- Flight I: 145 m (475 ft 9 in)
- Flight II / IAMD: 150 m (492 ft 2 in)
|
|---|
| Beam | 18 m (59 ft 1 in) |
|---|
| Draft | 5 m (16 ft 5 in) |
|---|
| Propulsion |
- CODLOG:
- 1 × GE LM2500 turbine
- 4 × MTU 4000 diesel engines
- Propellers
- Kongsberg Maritime controllable pitch propellers
|
|---|
| Speed |
- Flight I: > 35 knots (65 km/h; 40 mph)
- Flight II / IAMD: 29 knots (54 km/h; 33 mph)
|
|---|
| Complement |
- Flight I: 150
- Flight II / IAMD: 170
|
|---|
Sensors & processing systems |
- Combat systems
- Underwater combat suite:
- Thales CAPTAS-4 towed array sonar
- Thales BlueMaster UMS 4110 hull mounted sonar
- BlueScan digital acoustic system
- TUUM-6 underwater communication system
- Radars
- Communication systems
- Rohde & Schwarz external communications systems
- Navigation systems
|
|---|
| Armament |
- F110 Flight I:
- Torpedoes:
- Missiles:
- Guns:
- 1 × 127 mm OTO 127/64 LW Vulcano naval gun with Vulcano guided ammunition
- 2 × 30 mm and .50 in (12.7 mm) machine guns
- F110 Flight II / IAMD:
- Torpedoes:
- Missiles:
- Guns:
- 1 × 127 mm OTO 127/64 LW Vulcano naval gun with Vulcano guided ammunition
- 2 × Escribano E&M Sentinel 30 RWS (30 mm)
- 4 × Escribano E&M Sentinel 12.7 RWS (12.7 mm)
- Decoys:
- 6 × Mark 36 SRBOC (counter anti-ship missile / loitering munitions)
|
|---|
| Aircraft carried | 1 × SH-60 Seahawk or NH-90 helicopter |
|---|
|
|
The F110 class, also known as the Bonifaz class, are a multi-purpose, anti-submarine class of Aegis combat system-fitted heavy frigates under construction for the Spanish Navy. The project is being co-developed by the Spanish Ministry of Defence and the state-owned company Navantia. The construction of the first unit (Bonifaz) started in April 2022 and it was launched on September, 11, 2025, beginning the scheduled deliveries. The frigates of the Bonifaz class will eventually replace the Santa María class frigates.