El Insurgente
| El Insurgente | |||
|---|---|---|---|
El Insurgente train leaving Zinacantepec station | |||
| Overview | |||
| Locale | Greater Mexico City | ||
| Termini | |||
| Stations | 7 | ||
| Service | |||
| Type | Commuter rail | ||
| System | Tren Interurbano | ||
| Rolling stock | CAF Civity-based EMUs | ||
| History | |||
| Opened | 15 September 2023 | ||
| Last extension | 2 February 2026 | ||
| Technical | |||
| Line length | 57.7 km (35.9 mi) | ||
| Number of tracks | 2 | ||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
| Electrification | Overhead line, 25 kV 60 Hz AC | ||
| Operating speed | 160 km/h (99 mph) | ||
| |||
El Insurgente (lit. 'The Insurgent') is a 57.7-kilometre (35.9 mi) commuter rail line connecting Mexico City and Toluca in the State of Mexico. As part of the Tren Interurbano system, it is formally known as the Tren Interurbano Mexico City–Toluca. The project was announced by President Enrique Peña Nieto on 1 December 2012, and construction began in 2014.