Eastern span replacement of the San Francisco–Oakland Bay Bridge

San Francisco–Oakland Bay Bridge
(eastern span replacement)
Final appearance of the new bridge, circa 2013
View of original eastern span (right) and its replacement (left), just days after transfer of traffic
Coordinates37°49′00″N 122°21′07″W / 37.8168°N 122.3519°W / 37.8168; -122.3519
Carries10 lanes of I-80, pedestrians and bicycles
CrossesSan Francisco Bay east of Yerba Buena Island
LocaleSan Francisco Bay Area,
San Francisco and Alameda counties, California, U.S.
Official nameNone
Maintained byCalifornia Department of Transportation (Caltrans)
Characteristics
DesignConcrete-steel precast segment viaducts, dual steel orthotropic box beam self-anchored suspension main span, cast-in-place reinforced concrete transition connector
Total length2.2 mi (3.5 km)
Width258.33 ft (78.74 m)
Height525 ft (160 m) (SAS)
Longest span1,263 ft (385 m) (SAS)
Load limit500,000
Vehicles: N/A
(Restricted to standard trucks by tunnel and other structures)
191 ft (58 m)
No. of lanes10
History
Construction startJanuary 29, 2002
Construction endSeptember 2, 2013 (2013-09-02)
Construction cost$6.5 Billion ($8.61 billion in 2024 dollars)
OpenedSeptember 2, 2013 10:15pm
Statistics
Daily traffic270,000
Toll
  • East span, westbound only
  • FasTrak or pay-by-plate, cash not accepted
  • Effective January 1 – December 31, 2025 (2025-01-01 – 2025-12-31):
  • $8.00
  • $4.00 (carpools during weekday peak hours, FasTrak only)
Location
Interactive map of San Francisco–Oakland Bay Bridge
(eastern span replacement)

The eastern span replacement of the San Francisco–Oakland Bay Bridge was a construction project to replace a seismically unsound portion of the Bay Bridge with a new self-anchored suspension bridge (SAS) and a pair of viaducts. The bridge is in the U.S. state of California and crosses San Francisco Bay between Yerba Buena Island and Oakland. The span replacement took place between 2002 and 2013, and is the most expensive public works project in California history, with a final price tag of $6.5 billion, a 2,500% increase from the original estimate of $250 million, which was an initial estimate for a seismic retrofit of the span, not the full span replacement ultimately completed. Originally scheduled to open in 2007, several problems delayed the opening until September 2, 2013. With a width of 258.33 ft (78.74 m), comprising 10 general-purpose lanes, it is the world's widest bridge according to Guinness World Records.

The Bay Bridge has two major sections: the western suspension spans and their approach structures between San Francisco and Yerba Buena Island and the structures between YBI and the eastern terminus in Oakland. The original eastern section was composed of a double balanced cantilever span, five through-truss spans, and a truss causeway. This part became the subject of concern after a section collapsed during the Loma Prieta earthquake on October 17, 1989. The replacement span is engineered to withstand the largest earthquake expected over a 1500-year period, and it is expected to last at least 150 years with proper maintenance.