East Main station
The eastbound platform at East Main station | ||||||||||||||||
| General information | ||||||||||||||||
| Location | 229 112th Avenue Southeast Bellevue, Washington United States | |||||||||||||||
| Coordinates | 47°36′29″N 122°11′28″W / 47.60806°N 122.19111°W | |||||||||||||||
| System | Link light rail | |||||||||||||||
| Owner | Sound Transit | |||||||||||||||
| Platforms | 2 side platforms | |||||||||||||||
| Tracks | 2 | |||||||||||||||
| Connections | King County Metro | |||||||||||||||
| Construction | ||||||||||||||||
Structure type | At-grade | |||||||||||||||
| Accessible | Yes | |||||||||||||||
| History | ||||||||||||||||
| Opened | April 27, 2024 | |||||||||||||||
| Passengers | ||||||||||||||||
| 208 daily weekday boardings (2025) 67,757 total boardings (2025) | ||||||||||||||||
| Services | ||||||||||||||||
| ||||||||||||||||
| ||||||||||||||||
East Main station is an at-grade light rail station in Bellevue, Washington, United States. It is served by the 2 Line, part of Sound Transit's Link light rail system, and opened on April 27, 2024.