East Klang Valley Expressway
| East Klang Valley Expressway Lebuhraya Lembah Klang Timur 东巴生谷大道 | |
![]() EKVE Junction at Hulu Langat | |
| Route information | |
| Maintained by EKVE Sdn Bhd | |
| Length | 39.5 km (24.5 mi) |
| Existed | 2015–present |
| History | Opened in stages 30 August 2025: Phase 1A (Sungai Long Interchange to Ampang Interchange) 2026: Phase 1B (Ukay Perdana Interchange) |
| Major junctions | |
| North end | Jalan Ukay Perdana |
| Jalan Lembah Jaya B52 Jalan Hulu Langat Persiaran Mahkota Cheras 1 | |
| South end | |
| Location | |
| Country | Malaysia |
| Primary destinations | Gombak, Ulu Klang, Ampang, Hulu Langat, Cheras, Kajang |
| Highway system | |
The E27 East Klang Valley Expressway, EKVE, Kuala Lumpur North Dispersal Expressway (KL NODE) or Kuala Lumpur Outer Ring Road (KLORR) is an expressway in Klang Valley, Malaysia. The 39.5-kilometre-long (24.5 mi) expressway will connect Ukay Perdana in Ampang, Selangor and Bandar Sungai Long in Kajang. This expressway is part of the Kuala Lumpur Outer Ring Road (KLORR). The construction of the expressway began on 1 September 2015. Once completed, the expressway is expected to benefit 140,000 motorists per day.
The phase 1 of the expressway, from Sungai Long to Ampang, stretches 24.1 km and costs MYR 1.55 billion.
%20from%20Jalan%20Hulu%20Langat%20(260101)%2001%20(cropped).jpg%3C%2Ftitle%3E%3Cdefs%3E%3CclipPath%20id%3D%22alt-text-clip%22%3E%3Crect%20x%3D%220%22%20y%3D%220%22%20width%3D%22100%25%22%20height%3D%22100%25%22%20%2F%3E%3C%2FclipPath%3E%3C%2Fdefs%3E%3Crect%20width%3D%22100%25%22%20height%3D%22100%25%22%20fill%3D%22transparent%22%2F%3E%3Cg%20clip-path%3D%22url(%23alt-text-clip)%22%3E%3Ctext%20x%3D%2250%25%22%20y%3D%2250%25%22%20text-anchor%3D%22middle%22%20dominant-baseline%3D%22middle%22%20fill%3D%22%2354595d%22%20font-size%3D%2216%22%20font-family%3D%22sans-serif%22%3EEast%20Klang%20Valley%20Expressway%20(E27)%20from%20Jalan%20Hulu%20Langat%20(260101)%2001%20(cropped).jpg%3C%2Ftext%3E%3C%2Fg%3E%3C%2Fsvg%3E)