MRL East Coast Rail Link

East Coast Rail Link
Kota Bharu–Port Klang
A CR200J series train that will be used for the East Coast Rail Link
Overview
Native nameLaluan Rel Pantai Timur
StatusUnder construction
(95.08% as of July 2026)
OwnerMalaysia Rail Link Sdn Bhd
LocaleSection A : Kota Bharu – Pasir Puteh – Jerteh - Bandar Permaisuri – Kuala Terengganu
Section B : Dungun – Kemasik – Chukai – Cherating – Kuantan Port City – KotaSAS – Gambang – Maran
Section C : Temerloh – Bentong – Gombak – Serendah – Puncak Alam – Kapar – Northport/Westport
Stations20
Websitemrl.com.my (owner's website)
ecrl.com.my (official website)
Service
TypeInter-city rail, rail freight transport
Operator(s)Malaysia Rail Link Sdn Bhd & CCCC Joint Venture
DepotKuantan Port City
Rolling stockCRRC CR200J 6-car set EMU
Ridership5.40 million by 2030 (estimated)
History
Planned openingDecember 2026 (December 2026)
Technical
Line length665 km (413 mi) mixed single and double track with the entire provisional double track
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrification25 kV 50 Hz AC overhead line
Conduction systemWith driver
Operating speed160 km/h (passenger train)
80 km/h (freight train)
Route map
Preview warning: Using more than one of the following parameters in Template:Infobox rail line: color2, color.
East Coast Rail Link
Proposed network
ECRL 1.0 (2017)
Pengkalan Kubor
Keretapi Tanah Melayu Wakaf Bharu
KTM Intercity
MRL Kota Bharu
Jelawat
Tok Bali
Kelantan
Terengganu
state border
Kampung Raja
Penarik
Kuala Terengganu
Kuala Telemong
(proposed)
Pengkalan Berangan
Dungun
Bukit Besi spur line
Kerteh
(proposed)
Kemasik
Kemaman spur
Chukai
Terengganu
Pahang
state border
Cherating
Kuantan Port City
Kuantan Port City spur
Kota SAS
Kuantan Sentral
(proposed)
Gambang
Maran
Bentong
Bentong Tunnel (
18 km
11 mi
)
Pahang
Selangor
state border
Gombak Utara
Keretapi Tanah Melayu Gombak
Integrated Transport Terminal Gombak 5
Keretapi Tanah Melayu Serendah
future stations
Kapar
Keretapi Tanah MelayuJalan Kastam
Northport and Westport
ECRL 2.0 (2018)
MRL Kota Bharu
Pasir Puteh
Kelantan
Terengganu
state border
Jerteh
Bandar Permaisuri
Kuala Terengganu
Pengkalan Berangan
(future)
Dungun
Kemasik
Chukai
Terengganu
Pahang
state border
Cherating
Kuantan Port City
Kuantan Port City 2
Kota SAS
Gambang
Maran
Temerloh
to Mentakab
via branch line
KTM Intercity
Kemasul
(future)
Pahang
Negeri Sembilan
state border
Klawang
Nilai Sentral
(
Nilai Arab
Industrial Park
)
 ETS  1
Putrajaya Sentral
Jenjarom
Westport
ECRL 3.0 (2021)
MRL Kota Bharu
Pasir Puteh
Kelantan
Terengganu
state border
Jerteh
Bandar Permaisuri
Kuala Terengganu
Pengkalan Berangan
(future)
Dungun
Kemasik
Chukai
Terengganu
Pahang
state border
Cherating
Kuantan Port City
Kota SAS
Gambang
Maran
Temerloh
to Keretapi Tanah Melayu Mentakab
via branch line
KTM Intercity
Bentong
Genting Tunnel (
18 km
11 mi
)
Pahang
Selangor
state border
Keretapi Tanah Melayu Gombak
Integrated Transport Terminal Gombak 5
Keretapi Tanah Melayu Serendah
 ETS  2
future stations
Kapar
Keretapi Tanah Melayu Jalan Kastam
Northport
Westport

The East Coast Rail Link (ECRL, Malay: Laluan Rel Pantai Timur) is an under-construction standard-gauge double-track rail project connecting Port Klang on the Straits of Malacca to Kota Bharu in northeast Peninsular Malaysia, linking the East Coast Economic Region states of Pahang, Terengganu, and Kelantan to one another and to the central region of the peninsula's west coast.

The project is set to carry both passengers and freight from the west coast of Malaysia to the east, and vice versa. Construction began in August 2017.

On 3 July 2018, Malaysia Rail Link Sdn Bhd (MRL) instructed China Communications Construction Company (CCCC) to suspend all work under the engineering, procurement, construction, and commissioning contract of ECRL. The suspension was lifted a few months later after the signing of a supplementary agreement between MRL and CCCC in April 2019 on a revised construction cost and realignment of the southern route of the rail link.

ECRL is realized by a semi-automatic Chinese technology that lays 1.5 km of tracks a day with an accuracy of 10 millimeters using GPS satellites.