East Coast Integrated Depot

East Coast Integrated Depot
Construction site of the East Coast Integrated Depot in January 2024
Interactive map of East Coast Integrated Depot
Location
Location10 Laguna Golf Green, Singapore 488956
Coordinates1°19′38″N 103°57′26″E / 1.32736°N 103.95734°E / 1.32736; 103.95734
Characteristics
OperatorSMRT Trains Ltd (SMRT Corporation) (EWL & TEL)
SBS Transit DTL Pte Ltd (ComfortDelGro Corporation) (DTL)
Go-Ahead Singapore Pte Ltd (Go-Ahead Group plc) (Bus Depot)
Depot codeECID
TypeElevated (EWL)
At-grade (TEL & bus depot)
Underground (DTL)
RoadsUpper Changi Road East
Rolling stockKawasaki–Sifang C151A
Kawasaki–Sifang C151B
Kawasaki–Sifang C151C
Bombardier Movia C951 (Future)
Alstom Movia R151
Kawasaki–Sifang T251 (Future)
Routes served EWL  East–West Line
 DTL  Downtown Line (Future)
 TEL  Thomson–East Coast Line (Future)
History
Opened8 December 2025 (2025-12-08) (EWL)
5 July 2026 (2026-07-05) (Bus depot)
2H 2026; 3 months' time (TEL & DTL)

The East Coast Integrated Depot (ECID) is an integrated bus and train depot located in the Xilin subzone of Tampines, Singapore. It currently serves the East–West Line (EWL) of the Mass Rapid Transit (MRT) system, with plans to also serve the Downtown Line (DTL) and Thomson–East Coast Line (TEL). Construction is expected to be fully completed by the second half of 2026.

The ECID is located beside the site of the former Changi Depot, which was decommissioned in tandem with the opening of the ECID. It will be the first MRT depot to serve three MRT lines and the third to be integrated with a bus depot, after Tuas Depot on the EWL and Gali Batu Depot on the DTL.

With its design, an estimated 44 ha (110 acres) of land was saved, equivalent to approximately 60 football fields, as compared to building the depots separately. The depot is able to house approximately 200 trains of varying sizes and lengths, and 550 buses.