E class Melbourne tram

E Class
E.6007 at St Kilda, April 2016
The E Class interior, with passengers boarding the tram, December 2016
E Class tram Interior
Stock typeArticulated tramcar/light rail vehicle
ManufacturerBombardier Transportation/Alstom
Built atDandenong
Family nameFlexity Swift
ReplacedAll remaining W6, SW6 and W7 trams (excluding City Circle trams), and all remaining Z1 and Z2 trams.
Constructed2013–2021
Number built100
Number in service100
Fleet numbers
  • E.6001–E.6100
Capacity64/146 (seated/standing)
Depots
Specifications
Train length33.45 m (109 ft 9 in)
Width2.65 m (8 ft 8 in)
Height3.65 m (12 ft 0 in)
Floor height305mm (nominal)
Low-floor100%
Doors10 (five per side), all double-leaf
Articulated sections3 sections (two articulations)
Maximum speed80 km/h (50 mph)
Weight62 t (61 long tons; 68 short tons)(with passengers)
Traction motors6 × Bombardier 4-WXA-2257 105 kW (141 hp)
Power output630 kW (840 hp)
Acceleration1.3 m/s2 (2.9 mph/s)
Deceleration
  • 1.5 m/s2 (3.4 mph/s) (Average)
  • 2.8 m/s2 (6.3 mph/s) (Emergency)
Electric systems600 V DC (nominal) from overhead catenary
Current collectionPantograph
UIC classificationBo′+2′Bo′+Bo′
BogiesFlexx Urban 3000
Braking systemElectric (electrodynamic with friction holding)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge

The E Class trams are three-section, four-bogie articulated trams that were first introduced to the Melbourne tram network in 2013. They were built at the Dandenong rolling stock factory of Bombardier Transportation (later Alstom) with the propulsion systems and bogies coming from Bombardier/Alstom factories in Germany.

The E Class trams were initially ordered as part of the Tram Procurement Program, an $800 million Victorian Government project aimed at increasing capacity and reliability of the tram network through the introduction of new trams, creation of new depot space, and upgrades to existing infrastructure. In September 2010, 50 were ordered with an option to purchase a further 100. In May 2015, a further 20 were ordered, followed by additional orders for 10 in May 2017, September 2018 and May 2019, taking the total to 100.

The first tram was delivered in June 2013 and, after testing, entered service on route 96 on 4 November 2013.