Docklands Light Railway B07 Stock

B07 stock
Interior
In service2008–present
ManufacturerBombardier Transportation
Built atBautzen, Germany
Number built55
Formation2/3 vehicles per train
Fleet numbers101-155
Capacity(3-car train) 284 seated, 688 capacity
Depots
Line servedDocklands Light Railway
Specifications
Train length28 m (91 ft 10+3⁄8 in)
Width2.65 m (8 ft 8+3⁄8 in)
Height3.51 m (11 ft 6+1⁄4 in)
Doors4 pairs of doors each side per car, 1.5 m (4 ft 11 in) wide
Maximum speed
  • 80 km/h (50 mph) (Maximum speed capable)
  • 64 km/h (40 mph) (Regular operational speed)
Weight36 t (35 long tons)
Acceleration1.4 metres per second squared (3.1 mph/s)
Electric systems750 V DC third rail
Current collectionContact shoe bottom contact
Minimum turning radius38 m (125 ft)
Track gauge4 ft 8+1⁄2 in (1,435 mm) standard gauge

The Docklands Light Railway B07 stock is the third generation of train used on the Docklands Light Railway (DLR), a light metro system that serves the London Docklands area in the east of London.

In the mid-2000s, capacity on the DLR was increased with the extension of platforms to allow for three-car operation. Additional trains were also required to serve extensions to the network. 24 trains were therefore ordered from Bombardier to a similar, but updated design to the existing B90/B92/B2K stock. Following London's successful bid in July 2005 to host the Olympic and Paralympic Games in 2012, 31 additional trains were ordered, partly funded by the Olympic Delivery Authority. In all, a total of 55 trains were built in two batches between 2007 and 2009 at the Bombardier Transportation factory in Bautzen, Germany at a cost of around £100 million.

As with all DLR trains, the B07 stock are highly automated, running segregated from traffic and powered by a bottom-contact third rail. The automation system is a GoA3 driverless system, which requires a Passenger Service Agent (PSA) to manually open and close the doors and, when necessary, manually drive the train. The 'B' in the type codes refers to Beckton DLR depot, where they are primarily maintained.