D Line (Los Angeles Metro)

D Line
HR4000 train awaiting departure at Union Station
Overview
Other name(s)Red Line (1993–2006)
Purple Line (2006–2020)
OwnerLos Angeles Metro
Line number805
Termini
Stations11 (4 more under construction)
Websitemetro.net/riding/guide/d-line
Service
TypeRapid transit
SystemLos Angeles Metro Rail
DepotDivision 20 (Los Angeles)
Rolling stockBreda A650 or CRRC HR4000 running in 4 or 6 car consists
Ridership22,471,851 (2024) Decrease -13.2%
History
OpenedJanuary 30, 1993 (1993-01-30)
Technical
Line length9 miles (14 km)
Number of tracks2
CharacterFully underground (except yard)
Track gauge4 ft 8+1⁄2 in (1,435 mm) standard gauge
ElectrificationThird rail, 750 V DC
Operating speed70 mph (110 km/h) (max.)
29.5 mph (47.5 km/h) (avg.)
Route map
D Line highlighted in purple
Westwood/VA Hospital
Westwood/​UCLA
Up arrow Section 3 (2027)
Down arrow Section 2 (2027)
Century City
Beverly Drive
Wilshire/​La Cienega
Wilshire/Fairfax
Wilshire/​La Brea
Wilshire/​Western
Wilshire/​Normandie
Wilshire/​Vermont
Westlake/​MacArthur Park
Parking
7th Street/​Metro Center
A Line‍E Line‍J Line
Pershing Square
Angels Flight J Line
Civic Center/​Grand Park
J Line
Union Station
Amtrak Metrolink (California) A Line‍J Line FlyAway (bus) Parking

Handicapped/disabled access All stations are accessible

The D Line (formerly a branch of the Red Line from 1993–2006 and independently as the Purple Line from 2006–2020) is a fully underground rapid transit line in Los Angeles, California, running for 9 miles (14 km) between Beverly Hills and Downtown Los Angeles. It is the shortest of six lines of the Los Angeles Metro Rail system, operated by Los Angeles Metro.

The D Line is one of the city's two fully underground lines (along with the B Line). The two lines share tracks between Koreatown and Downtown Los Angeles. As of 2019, the combined B and D lines averaged 133,413 boardings per weekday.

In 2020, Metro renamed all of its lines using letters and colors, with the Purple Line becoming the D Line (retaining the purple color in its service bullet) and the Red Line becoming the B Line.

Construction has been underway since 2014 for a major extension of the line. The three-station, 3.9-mile (6.3 km) Section 1 opened on May 8, 2026, while sections 2 and 3 to downtown Beverly Hills, Century City, and Westwood, both expected to open in 2027, will add four new stations and 5.2 miles (8.4 km) of track to the line.