Docklands Light Railway P86 and P89 stock

P86 and P89 stock
P86 at West India Docks in 1987
In serviceDocklands Light Railway:
  • P86: 1987–1995
  • P89: 1989–1995
Essen Stadtbahn:
  • P86: 1991–present
  • P89: 1996–present
Manufacturers
Built at
Refurbished
  • P86: 2005–2012
  • P89: 1996
Number builtP86: 11
P89: 10
SuccessorDLR: B90 and B92
Essen Stadtbahn: Ruhrbahn HF1
Fleet numbers
  • P86: 01–11
  • P89: 12–21
CapacityP86: 84 seats, 130 standing
DepotPoplar DLR depot
Lines served
Specifications
Car body constructionsteel
Train length28 m (91 ft 10+3⁄8 in)
Width2.65 m (8 ft 8+3⁄8 in)
Height3.4 m (11 ft 1+7⁄8 in)
Doors4 double inward gliding doors
Articulated sections2
Wheelbase10 metres (33 ft) bogie centres
Maximum speed80 kilometres per hour (50 mph)
Weight39 t (38 long tons)
Electric systems750 V DC third rail
Current collectionContact shoe bottom contact
Minimum turning radius40 metres (130 ft)
Coupling systemScharfenberg
Track gauge4 ft 8+1⁄2 in (1,435 mm) standard gauge
Notes/references

The Docklands Light Railway P86 and P89 stock were the first generation of trains used on the Docklands Light Railway (DLR), a light metro system which serves the London Docklands area in the east of London.

In the mid 1980s, 11 trains were ordered from West German company Linke-Hofmann-Busch by the GEC and Mowlem consortium building the system. These P86 trains entered service with the opening of the DLR in 1987. 10 additional trains were ordered from British Rail Engineering Limited (BREL) in the late 1980s, as the P86 lacked the fire safety standards required for underground operation, and could not be coupled in pairs. However, further issues with the signalling system, coupling of units and low capacity meant that they were replaced by B90 and B92 trains by 1995. As with all DLR trains, both the P86 and P89 trains were highly automated, running segregated from traffic powered by a bottom-contact third rail.

In the early 1990s, all P86 and P89 units were sold to Essener Verkehrs-AG (EVAG) in Essen, Germany for use on the Essen Stadtbahn. The P86 trains entered service in Essen from 1991, and were refurbished from the mid 2000s. The P89 trains were refurbished prior to entering service from 1996 onwards. In 2021, Ruhrbahn announced that 44 vehicles had been ordered from Construcciones y Auxiliar de Ferrocarriles to replace the Docklands vehicles by 2026.