Crotty Dam
| Crotty Dam | |
|---|---|
Crotty Dam (at right) aerial shot from the east | |
Crotty Dam Location of the dam in Tasmania | |
Interactive map of Crotty Dam | |
| Country | Australia |
| Location | West Coast Tasmania |
| Coordinates | 42°09′37″S 145°37′00″E / 42.160151°S 145.61657°E |
| Purpose | Power |
| Status | Operational |
| Opening date | 1991 |
| Owner | Hydro Tasmania |
| Dam and spillways | |
| Type of dam | Rock-fill dam |
| Impounds | King River |
| Height | 83 m (272 ft) |
| Length | 245 m (804 ft) |
| Width (crest) | 300 mm (12 in) |
| Dam volume | 770×103 m3 (27×106 cu ft) |
| Spillways | 1 |
| Spillway type | Controlled and uncontrolled |
| Spillway capacity |
|
| Reservoir | |
| Creates | Lake Burbury |
| Total capacity | 1,081,420 ML (876,720 acre⋅ft) |
| Active capacity | 1,065,000 ML (863,000 acre⋅ft) |
| Catchment area | 559 km2 (216 sq mi) |
| Surface area | 5,325 ha (13,160 acres) |
| Normal elevation | 229 m (751 ft) AHD |
| John Butters Power Station | |
| Coordinates | 42°09′21″S 145°32′04″E / 42.15583°S 145.53444°E |
| Operator | Hydro Tasmania |
| Commission date | 1992 |
| Type | Conventional |
| Hydraulic head | 184 m (604 ft) |
| Turbines | 1 x 144 MW (193,000 hp) Fuji Frnacis-type |
| Installed capacity | 144 MW (193,000 hp) |
| Capacity factor | 0.9 |
| Annual generation | 576 GWh (2,070 TJ) |
| Website hydro.com.au | |
The Crotty Dam, also known during construction as the King Dam, or the King River Dam on initial approval, is a concrete-faced rockfill embankment dam across the King River, between Mount Jukes and Mount Huxley, in the West Coast region of Tasmania, Australia. Completed in 1991, the resultant reservoir, Lake Burbury, was established for the purpose of generating hydro-electric power via the John Butters Power Station. The dam, its reservoir, and the power station are owned and operated by Hydro Tasmania.