Connaught Bridge Power Station
| Connaught Bridge Power Station | |
|---|---|
Connaught Bridge Power Station | |
| Official name | Connaught Bridge Power Station |
| Country | Malaysia |
| Location | Kampong Jawa, Klang, Selangor |
| Coordinates | 3°02′N 101°28′E / 3.04°N 101.47°E |
| Status | Operational |
| Commission date | February 2016 (Redevelopment) 26 March 1953 (Block 1) |
| Decommission date | December 2018 (Block 1) |
| Owner | |
| Operators | Central Electricity Board (CEB) (Lembaga Letrik Pusat (LLP)) (1953-1965) National Electricity Board (NEB) (Lembaga Letrik Negara (LLN)) (1965-1990) Tenaga Nasional Berhad (TNB) (1990-present) |
| Thermal power station | |
| Primary fuel | Gas |
| Secondary fuel | Distillate Fuel |
| Combined cycle? | Yes |
| Power generation | |
| Nameplate capacity |
|
| External links | |
| Commons | Related media on Commons |
Connaught Bridge Power Station is a combined cycle (1 gas turbines and 1 steam turbine) power station located near Kampong Java in Klang, Selangor, Malaysia. It is one of the oldest power station in the country.
Prior to its redevelopment, the Connaught Bridge Power Station had an installed capacity of 895 MW consisting of a combined cycle unit (2 gas turbines and 1 steam turbine) producing 315 MW and four open cycle units (4 x GT13E) of 130 MW each. At the time, it and was the third largest of seven sister TNB power plants in the country
It was opened on 26 March 1953 by the High Commissioner for the Federation of Malaya, Sir Gerald Templer.