Clover Park (Florida)

Clover Park
Interactive map of Clover Park
Former names
Thomas J. White Stadium (1988–2004)
Digital Domain Park (2010–2012)
Tradition Field (2004–2009; 2012–2016)
First Data Field (2017–2019)
Address31 Piazza Drive
Port St. Lucie, FL 34986
Coordinates27°19′31.01″N 80°24′16.18″W / 27.3252806°N 80.4044944°W / 27.3252806; -80.4044944
OwnerSt. Lucie County
OperatorSt. Lucie Parks & Recreation Department
Capacity7,160
SurfaceGrass
Field size
Left field: 338 feet (103 m)
Left-Center field: 371 feet (113 m)
Center field: 410 feet (120 m)
Right-Center field: 371 feet (113 m)
Right field: 338 feet (103 m)
Construction
GroundbreakingDecember 19, 1986
Built1987
OpenedMarch 5, 1988
Renovated2019
Cost$11 million
($29.9 million in 2025 dollars)
ArchitectsHoon & White
Structural engineer
Lantz Jones Nebraska, Inc.
General contractor
Hunzinger Construction
Tenants
New York Mets (MLB) (spring training)
St. Lucie Mets (FSL) 1988–present
FCL Mets (FCL) 1992–1999; 2004–2011; 2013–present

Clover Park is a baseball stadium located in Port St. Lucie, Florida. The stadium was built in time for the 1988 season and holds 7,160 people. It is the spring training home of the New York Mets (who moved from St. Petersburg's Al Lang Stadium), as well as the home to the St. Lucie Mets Single-A team and the Florida Complex League Mets Rookie League team. The stadium shares the same field dimensions of the now demolished Shea Stadium. It also sometimes hosts college games.