Chiltern Tunnel

Chiltern Tunnel
Interactive map of Chiltern Tunnel
Overview
LineHigh Speed 2
LocationUnited Kingdom (Buckinghamshire, Hertfordshire)
Coordinates51°42′34″N 0°41′35″W / 51.7095°N 0.6931°W / 51.7095; -0.6931 (north portal)
OS grid referenceTQ022913
StatusConstruction complete, fitting out
CrossesChiltern Hills
StartWest Hyde, Hertfordshire
EndSouth Heath, Buckinghamshire
Operation
Work began13 May 2021 (boring)
Constructed2020–2026
TrafficHigh-speed passenger trains
Technical
Length16.04 km (9.97 miles)
No. of tracks2 single-track tunnels
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Electrified25 kV 50 Hz AC
Operating speed
320 km/h (200 mph)
Width9.1 metres (30 ft)
Grade−0.835% to +2.500%
Cross passages38
Chiltern Tunnel
HS2
South Heath
(north portal)
 B485 
Chesham Road intervention shaft
London-Aylesbury line
Little Missenden shaft
 A413 
 A404 
Amersham shaft
 A355 
Chalfont St Giles shaft
 A413 
Chalfont St Peter shaft
 M25 
Buckinghamshire-Hertfordshire border
West Hyde
(south portal)
HS2

The Chiltern Tunnel is a high-speed railway tunnel in Buckinghamshire and Hertfordshire, England, which will carry the High Speed 2 (HS2) railway line under the Chiltern Hills. The twin-bore tunnels, which are 16.04 km (9.97 miles) long, are the longest on the HS2 line. Each tunnel also has additional 220 m (720 ft) entry and 135 m (443 ft) exit perforated concrete portals to reduce sudden changes in air pressure and subsequent noise.

A contract for the tunnel's construction was awarded in 2017; preparatory work commenced during the following year. In May 2021, it was announced that excavation had commenced. The boring process, which was largely performed by a pair of tunnel boring machines (TBMs), advanced at an average speed of 15 m (49 ft) per day; both TBMs completed their drives by March 2024. Civil engineering work on the tunnel was completed by January 2026.