Canal Tunnels

Canal Tunnels
Canal Tunnels northern entrance at Belle Isle Junction prior to opening
Interactive map of Canal Tunnels
Overview
LineEast Coast Main Line
Coordinates51°32′22″N 0°07′36″W / 51.5395°N 0.1266°W / 51.5395; -0.1266
OS grid referenceTQ 30404 84602
StatusOperational
SystemNational Rail
StartBelle Isle Junction, East Coast Main Line
EndCanal Junction, Thameslink Core
Operation
Constructed2004–2006
Opened2018
OwnerNetwork Rail
Operator
Technical
Design engineerTunnels: Halcrow Group
Fitting out: Arup
Length820 m (2,690 ft)
No. of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Electrified25 kV 50 Hz AC
Width6 m (20 ft)

The Canal Tunnels are a pair of single track railway tunnels in north London which connect the East Coast Main Line (ECML) at Belle Isle Junction to the low level platforms at London St Pancras railway station, allowing connection to the Thameslink route. Their name comes from the Regent's Canal, which they pass close beneath, and allow up to eight trains per hour operated by Thameslink to access the Thameslink route from the ECML, significantly increasing capacity on the former. The tunnels also allow Thameslink trains stabled at Hornsey Depot to access the route.

The tunnels were conceived as part of the overarching Thameslink Programme, which aimed to improve capacity, reliability, and utility of the Thameslink route. They reinstated a link between the ECML and Snow Hill tunnel, which connects London north–south that had been severed after the closure of King's Cross York Road in 1977. The tunnels were the first part of the program to be constructed, between 2004 and 2006, but their fitting out did not begin until 2013. The first services ran through the Canal Tunnels during February 2018, while its official opening occurred three months later, and have allowed the theoretical maximum capacity of the Thameslink route to increase by fifty percent from sixteen to twenty-four trains per hour.