CT Fastrak

CTfastrak
CTfastrak buses at Flatbush Avenue station
LocaleCentral Connecticut
Service typeBus rapid transit
Routes8 local routes
4 express routes
Stations10
Daily ridership
14,277 (August 2023)
Fuel typeHybrid diesel-electric (Battery Electric in 2027)
OperatorConnecticut Transit
Program Director
Michael Sanders
Websitecttransit.com/services/ctfastrak
System map

Hartford
Amtrak Greyhound Lines
Sigourney Street
Parkville
Kane Street
Flatbush Avenue
Elmwood
Newington Junction
Cedar Street
East Street
East Main Street
Downtown New Britain

CT Fastrak (stylized as CTfastrak and constructed as the New Britain-Hartford Busway) is a regional bus rapid transit system currently operating between downtown Hartford and Downtown New Britain station in New Britain in central Connecticut. Operated by Connecticut Transit, it is the first bus rapid transit system in Connecticut and the second in New England after the MBTA Silver Line. CTfastrak opened on March 28, 2015 after fifteen years of planning and three years of construction.

CTfastrak services run on a 9.4-mile (15.1 km) dedicated busway which runs on an abandoned railroad right-of-way from Downtown New Britain to Newington Junction and alongside the active New Haven–Springfield Line from Newington Junction to downtown Hartford. Eight local and four express routes operate along the busway and over on-street loops in downtown Hartford.

CTfastrak is rated Silver according to the BRT Standard, along with the Van Ness Bus Rapid Transit and HealthLine.