China Railway CRH1

China Railway CRH1 EMU
In service1 February 2007–present
ManufacturersBombardier Sifang (Qingdao) Transportation Ltd.
(Bombardier Transportation and CSR Sifang)
Family nameCRH1A/B: Regina
CRH1E, CRH1A–A/E–NG and CRH380D: Zefiro
ReplacedX 2000 "Xinshisu", DJJ1 "Blue Arrow", DJF2 "Pioneer"
Number builtCRH1A: 128 trainsets (1024 cars)
CRH1A–A: 87 trainsets (696 cars)
CRH1B: 24 trainsets (384 cars)
CRH1E: 15 trainsets (240 cars)
CRH1E–NG: 5 trainsets (80 cars)
CRH380D: 85 trainsets (680 cars)
Number scrapped1 trainset (4 cars; derailment)
SuccessorCR300AF, CR300BF
FormationCRH1A/A–A: eight cars per trainset (5M3T)
CRH1B/E/E–NG: 16 cars per trainset (10M6T)
CRH380D: eight cars per trainset (4M4T)
CapacityCRH1A: 668 or 611 or 646 or 635
CRH1A–A: 613
CRH1B: 1299
CRH1E/E–NG: 618 or 642
CRH380D: 495
OperatorsChina Railway
- CR Guangzhou
- CR Shanghai
- CR Nanchang
- CR Chengdu
Lines servedHigh speed and major conventional rail lines in southern China
Specifications
Car body constructionCRH1A/B and first-generation CRH1E: Stainless steel
CRH1A–A, CRH1E–NG and CRH380D: Aluminium alloy
Train lengthCRH1A: 213.5 m (700 ft 6 in)
CRH1A–A: 207.9 m (682 ft 1 in)
CRH1B: 426.3 m (1,398 ft 7 in)
CRH1E: 428.9 m (1,407 ft 2 in)
CRH1E–NG: 413.1 m (1,355 ft 4 in)
CRH380D: 215.3 m (706 ft 4 in)
Platform height500–1,250 mm (1 ft 7.7 in – 4 ft 1.2 in)
Maximum speedCRH1A:200 km/h (124 mph)or 250 km/h (155 mph)
CRH1A–A/B/E/E–NG:250 km/h (155 mph)
CRH380D: 380 km/h (236 mph)
WeightCRH1A/A–A:435 t (428 long tons; 480 short tons)
CRH1B:850 t (837 long tons; 937 short tons)
CRH1E/E–NG:890 t (876 long tons; 981 short tons)
CRH380D:450 t (443 long tons; 496 short tons)
Traction systemWater-cooled IGBT-VVVF inverter control (Bombardier MITRAC 1000)
Traction motors3-phase AC induction motor (Bombardier DR-1200 [CRH1A] or DR-1500 [CRH1B/E])
Power outputCRH1A: 5.3 MW (7,107 hp)
CRH1A–A: 5.5 MW (7,376 hp)
CRH1B/E/E–NG: 11 MW (14,751 hp)
CRH380D: 10 MW (13,410 hp)
TransmissionAC-DC-AC
AccelerationCRH1A/B/E:Maximum 0.6 m/s2 (1.3 mph/s)
CRH380D: 0.48 m/s2 (1.1 mph/s)
DecelerationCRH1A:Emergency 1.2 m/s2 (2.7 mph/s)
General 0.8 m/s2 (1.8 mph/s)
Electric system25 kV 50 Hz AC Overhead catenary
Current collectionPantograph
Braking systemsRegenerative, electronically controlled pneumatic brakes
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge

The CRH1 is a group of electric multiple units operated by China Railway under the Hexie brand (simplified Chinese: 和谐号; traditional Chinese: 和諧號; pinyin: Héxié Hào; lit. 'Harmony'). The trains were built in Qingdao, Shandong, by Bombardier Sifang (Qingdao) Transportation, a joint venture between Bombardier Transportation and Sifang. The class entered passenger service on 1 February 2007.

Despite the shared CRH1 designation, the trains belong to two substantially different Bombardier design lineages. The CRH1A and CRH1B are derived from the regional Regina C2008, while the original CRH1E sleeper is derived from the Zefiro 250. The division by platform does not coincide exactly with the change in body material: the original CRH1A and CRH1E used stainless-steel carbodies, whereas the later CRH1A-250 (CRH1A–A) and new-generation sleeper designs use aluminium.

The Chinese Ministry of Railways ordered the Regina-based trains for 200 km/h (120 mph) regional intercity services as part of the same procurement programme as the Shinkansen-based CRH2A and Pendolino-based CRH5A. By August 2005, two batches totalling 40 eight-car CRH1 trainsets were on order. In July 2010, a further 40 eight-car CRH1A trains were ordered.

Although the Regina platform originated as a regional train, CRH1-family sets have also worked long-distance services lasting many hours. In April 2017, a daytime sleeper service from Shanghai to Chengdu used a 16-car CRH1E and was scheduled to take 12 hours 58 minutes; the previous fastest journey had taken 14 hours 23 minutes.