Burning Plasma Experimental Superconducting Tokamak
| Burning Plasma Experimental Superconducting Tokamak | |
|---|---|
| Device type | Tokamak |
| Location | Hefei, Anhui, China |
| Affiliation | Institute of Plasma Physics, Chinese Academy of Sciences |
| Technical specifications | |
| Major radius | 3.60 m (11.8 ft) |
| Minor radius | 1.10 m (3 ft 7 in) |
| Plasma volume | 140 m3 |
| Magnetic field | 6.15 T (61,500 G) |
| Heating power | 50 MW |
| Fusion power | 250 MW |
| Plasma current | 7 MA |
| History | |
| Date(s) of construction | 2023 |
| Year(s) of operation | 2027(expected) |
| Preceded by | EAST(HT-7U) |
| Succeeded by | China Fusion Engineering Test Reactor(CFETR) |
The Burning Plasma Experimental Superconducting Tokamak (BEST) is a compact, high-field superconducting tokamak under construction in Hefei, Anhui, China. Developed by the Institute of Plasma Physics, Chinese Academy of Sciences (ASIPP), BEST is designed to conduct deuterium–tritium (D–T) fusion experiments and investigate Burning-plasma, a state in which the energy deposited in the plasma by fusion-produced alpha particles provides a significant portion of the heating required to sustain the fusion reaction. Construction of BEST began in 2023, with first plasma currently targeted for late 2027.
Its research programme aims to achieve scientific breakeven (Q ≥ 1), develop long-pulse D–T operation and investigate alpha-particle heating and burning-plasma physics at approximately (Q ≤ 5).