Bulfinch Crossing
| Bulfinch Crossing | |
|---|---|
One Congress | |
Location within Boston | |
General information | |
| Status | Under construction |
| Type | Office, retail |
| Coordinates | 42°21′46″N 71°03′31″W / 42.36278°N 71.05861°W |
| Named for | Bulfinch Triangle |
| Groundbreaking | Summer 2019 |
Construction started | Late 2015 |
Completed | 2023 |
| Opening | 2023 |
| Height | |
| Roof | 520 ft (160 m) |
| Top floor | 600 ft (180 m) |
| Technical details | |
| Floor count | 43 |
| Floor area | 1,012,000 sq ft (94,000 m2) |
| Design and construction | |
| Architect | César Pelli |
Architecture firm | Pelli Clarke Pelli |
| Developer | HYM Investment Group |
| Other designers | CBT Architects |
| Main contractor | Tishman Construction |
| Other information | |
| Facilities | MBTA subway and bus station, Bluebikes dock, charging station, Zipcar, Maven, Enterprise Rent-A-Car |
| Parking | 1,160 spaces |
| Website | |
| bulfinchcrossing www | |
| References | |
| Bulfinch Crossing | |
|---|---|
The Sudbury | |
Interactive map of the Bulfinch Crossing area | |
General information | |
| Status | Completed |
| Type | Residential, retail |
| Named for | Bulfinch Triangle |
| Groundbreaking | January 24, 2017 |
Construction started | Late 2015 |
Completed | 2020 |
| Opening | 2020 |
| Height | |
| Roof | 519 ft (158 m) |
| Technical details | |
| Floor count | 45 |
| Floor area | 547,900 sq ft (50,900 m2) |
| Design and construction | |
| Architects | Pelli Clarke Pelli and CBT Architects |
| Developer | HYM Investment Group |
| Other designers | CBT Architects |
| Other information | |
| Number of rooms | 423 (residential), 200 (hotel) |
| Facilities | MBTA subway and bus station, Bluebikes dock, charging station, Zipcar, Maven, Enterprise Rent-A-Car |
| Parking | 1,160 spaces |
| Website | |
| bulfinchcrossing | |
| References | |
Bulfinch Crossing (also known as the Government Center Garage Redevelopment) is a redevelopment project in Downtown Boston, Massachusetts, United States. It is planned to consist of two skyscrapers, a smaller residential tower, a low-rise office building, a hotel, and a low-rise retail building. Site preparation began in late 2015, and construction officially commenced on January 24, 2017, with four planned phases. Phases 1 and 2 are complete, Phase 3 is approved, and Phase 4 planning has not begun. Construction on the residential tower completed in 2020. The high-rise office tower, One Congress, commenced construction in 2019 and topped off in July 2021; after an announced plan to open in 2022, it officially opened in September 2023. However, as of April 2026, the rest of the site was still under construction, and the nearby Haymarket bus terminal was still closed, with the remaining project timeline unclear.