Bucharest Metro Line M4

Line M4
Overview
StatusOperational
Termini
Stations8
Service
TypeRapid transit
SystemBucharest Metro
OperatorMetrorex S.A.
DepotStrăulești
Rolling stockBM1 (Astra IVA)
BM2 (Bombardier)
Ridership26949000 (2019)
History
Opened2000
Last extension2017
Technical
Line length7.44 km (4.62 mi)
Track gauge1,432 mm (4 ft 8+3⁄8 in)
Electrification750 V DC third rail
Route map

Handicapped/disabled access Străulești Bus interchange Parking
Handicapped/disabled access Laminorului
Handicapped/disabled access Parc Bazilescu
Handicapped/disabled access Jiului
M6 (under construction)
Handicapped/disabled access 1 Mai
Handicapped/disabled access Grivița
Handicapped/disabled access Basarab
Mainline rail interchange
Gara de Nord
Mainline rail interchange
planned extension to Gara Progresul
Line M4
Handicapped/disabled access Străulești Bus interchange Parking
Handicapped/disabled access Laminorului
Handicapped/disabled access Parc Bazilescu
Handicapped/disabled access Jiului
M6 (under construction)
Handicapped/disabled access 1 Mai
Handicapped/disabled access Grivița
Handicapped/disabled access Basarab
Mainline rail interchange
Gara de Nord
Mainline rail interchange
planned extension to Gara Progresul

M4 is one of the five lines of the Bucharest Metro. It is currently 7.44 km (4.6 mi) long and runs from Gara de Nord to Străulești, following the Griviței and Bucureștii Noi avenues.