Hawthorne test tunnel

Boring test tunnel
Interactive map of Boring test tunnel
Overview
Other names
  • The R&D Tunnel
  • Boring test tunnel
LocationHawthorne, California, U.S.
Coordinates
RouteWest 120th Street
StartSpaceX Parking Lot
Operation
Work beganDecember 17, 2016
OpenedDecember 18, 2018 (2018-12-18)
OperatorThe Boring Company
CharacterLimited access
Technical
Length1.14 mi; 6,000 ft
(1.83 km)
No. of lanes1
Width12.5 feet (3.8 m)

The Hawthorne test tunnel, or Boring test tunnel, is a 1.14 miles (1.83 km) tunnel in Hawthorne, California, intended for testing “tunneling and public transportation systems”, constructed between 2016 and 2018. It was accompanied by a mile-long aboveground tube on nearby Jack Northrop Ave designed for testing hyperloop and loop-based transportation, which was used for student competitions in 2018 and 2019 before being dismantled in 2022.