Belgrade Tower

Belgrade Tower
Кула Београд
Kula Beograd
Interactive map of the Belgrade Tower area
Alternative names
Kula Belgrade
General information
StatusCompleted in 2024; occupancy-permit application pending as of July 2026
TypeMixed-use: hotel, residences and observation deck
LocationBelgrade Waterfront, Savski Venac, Belgrade, Serbia, Nikolaja Kravcova 1a, 11000 Belgrade
Groundbreaking15 April 2016
Construction started
February 2019 (main structural works)
Topped-outJuly 2021
Completed
October 2024 (ceremony only)
ClientBelgrade Waterfront (BW Kula d.o.o. Beograd)
Height
Height168 m (551 ft)
Observatory41st floor
Technical details
Structural systemReinforced-concrete core and frame on a piled raft foundation
MaterialReinforced and post-tensioned concrete
Floor count42 levels, plus two basement levels
Floor areaOver 66,700 m2 (718,000 sq ft), including the podium and basements
Design and construction
ArchitectSkidmore, Owings & Merrill
DeveloperEagle Hills
EngineerDNEC (FIDIC engineer and site-supervision consultant)
Structural engineer
Skidmore, Owings & Merrill (foundation design); AECOM (tower structure); DNEC (engineer of record)
Main contractorImpresa Pizzarotti-Millennium Team joint venture

Belgrade Tower (Serbian: Кула Београд, romanized: Kula Beograd), officially known as Kula Belgrade, is a 42-floor, 168-meter (551 ft) tall skyscraper as part of the Belgrade Waterfront project in Belgrade, Serbia. It was topped out in 2021 and ceremonially opened in 2024 but still lacks a use permit due to issues with the HVAC and fire protection systems.

Its lower and upper floor plans are rotated by approximately 90 degrees relative to each other, with the geometric transition occurring between levels 12 and 20 through inclined and branching columns and post-tensioned transfer beams and slabs. The tower is supported by a piled-raft foundation necessitated by the mechanical properties of the upper soil layers; the piling works, performed by Novkol under the supervision of Mace, included 1,200 mm (47 in)-diameter piles beneath the tower and an extensive testing programme that included Osterberg-cell, static, dynamic and pile-integrity tests. The approximately 4,750 m3 (168,000 cu ft) concrete raft beneath the tower was poured continuously over about 60 hours in August 2019, after which the central core was raised using hydraulically operated jump-formwork, while post-tensioning was used for most hotel and residential floor slabs. Skidmore, Owings & Merrill developed the architectural concept and initial foundation and structural scheme, while AECOM prepared the second-stage structural design. A local joint venture comprising Energoprojekt Urbanizam i Arhitektura, Energoprojekt Entel and DNEC adapted and checked the design for Serbian approval requirements. The main construction works were carried out by a joint venture of Impresa Pizzarotti and Millennium Team, with DNEC acting as the engineer under the FIDIC contract and BG&E providing structural value-engineering consultancy during construction.

Upon topping out in 2021, it remained the tallest building in the Balkans outside of Turkey by roof height for two years before being surpassed by the 202-meter (663 ft) Sky Fort in Sofia, Bulgaria, in 2023. It remains the second-tallest building in the former Yugoslavia after the 172-meter (564 ft) Avaz Twist Tower in Sarajevo, Bosnia and Herzegovina.