Barking Riverside railway station
The completed station in July 2022 | |||||
| General information | |||||
| Location | Barking Riverside, Barking and Dagenham | ||||
| Coordinates | 51°31′09″N 0°06′53″E / 51.519108°N 0.114764°E | ||||
| Owner | Transport for London | ||||
| Manager | London Overground | ||||
| Platforms | 2 | ||||
| Connections | Barking Riverside Pier | ||||
| Construction | |||||
| Accessible | Yes | ||||
| Other information | |||||
| Station code | BGV | ||||
| Fare zone | 4 | ||||
| Website | Official website | ||||
| History | |||||
| Opened | 18 July 2022 | ||||
| Passengers | |||||
| National Rail annual entry and exit | |||||
| 2022–23 | |||||
| 2023–24 | |||||
| 2024–25 | |||||
| |||||
Barking Riverside is a railway station in the London Borough of Barking and Dagenham, East London. The eastern terminus of the Suffragette line of the London Overground, the station serves the Barking Riverside regeneration area and was built as part of a £327m extension of the Gospel Oak to Barking line. It opened on 18 July 2022 and provides interchange with the Uber Boat by Thames Clippers boat service from Barking Riverside Pier.
The extension runs partly over the existing London, Tilbury and Southend line from Barking, operated over by c2c, and over 1.5 kilometres (0.93 mi) of new track laid to the new station. The extension reduces typical journey times to the centre of Barking from the area by 18 minutes.