Bandra Kurla Complex high-speed railway station

Bandra Kurla Complex high-speed railway station
General information
LocationBandra Kurla Complex, Mumbai, Maharashtra
India
Coordinates19°04′06″N 72°51′57″E / 19.0682°N 72.8659°E / 19.0682; 72.8659
Elevation18 metres (59 ft)
OperatorNational High Speed Rail Corporation Limited
LineMumbai–Ahmedabad HSR
Platforms6
Tracks6
Connections Aqua Line Bandra Kurla Complex
2B-Yellow Line Income Tax Office (Under–construction)
Construction
Structure type
Underground
ParkingYes
Other information
Statusunder-construction
History
Opening2029
Route map
Sabarmati Depot and Workshop
Sabarmati
Sabarmati Junction railway station  Red Line  Ahmedabad Bus Rapid Transit System
Ahmedabad
Ahmedabad Junction railway station Kalupur Railway Station metro station Ahmedabad Bus Rapid Transit System
Anand/Nadiad
Maintenance Depot
Vadodara
Vadodara Junction railway station
Bharuch
Surat
Surat Depot
Bilimora
Kharera River
Maintenance Depot
Vapi
Boisar
Maintenance Depot
Virar
Ulhas River
Thane Depot and Workshop
Thane
7 km (4.3 mi) tunnel
under Thane Creek
Mumbai BKC
Key
Indian Railways
(including Western DFC on the same line)
Western DFC
Western DFC (under construction)
Ahmedabad Metro
Source
Location
Bandra Kurla Complex high-speed railway station is located in Maharashtra
Bandra Kurla Complex high-speed railway station
Bandra Kurla Complex high-speed railway station
Location within Maharashtra
Bandra Kurla Complex high-speed railway station is located in India
Bandra Kurla Complex high-speed railway station
Bandra Kurla Complex high-speed railway station
Location within India
Interactive map

Bandra Kurla Complex high-speed railway station, also known as Mumbai BKC station, is an under-construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. Located at Bandra Kurla Complex, Mumbai, Maharashtra, India, it is the only underground station on the Mumbai–Ahmedabad high-speed rail corridor and the southern terminus of the corridor. It is India's first underground bullet train station, located at a depth of approximately 32 metres (105 ft) below ground level, equivalent to a 10-storey standalone building. The station will have six platforms, each approximately 414 metres (1,358 ft) long, sufficient to accommodate425 m (1,394 ft) length for 16-coach E5 Series Shinkansen trains. The station is being constructed under Package C1 of the Mumbai–Ahmedabad high-speed rail corridor by a Joint Venture (JV) of Hyderabad-based Megha Engineering and Infrastructure Limited (MEIL) and Hindustan Construction Company Limited (HCC), contracted by the National High-Speed Rail Corporation Limited (NHSRCL).